Logo Lanfrica
  • Home
  • Atlas
  • Insights
  • Docs
  • Sign in

© 2026 Lanfrica. All rights reserved. All copyrights of the resources shown on the Lanfrica website belong to the original copyright holders, unless explicitly stated otherwise.

A Parametric, Geometry-Aware Residential Construction Cost Estimation Model for Ghana: Design, Validation, and the "Completeness Gap" in Informal Contractor Quotes

Domain:

socioeconomic

Record type:

papersoftware
Creator:
ApaOpoTea
Host:avatar
Ghana faces a residential housing deficit of two million units. A key driver of project failure is the "completeness gap", a systematic discrepancy between informal contractor quotes and actual costs. Informal estimates often use flat per-square-metre pricing that omits essential structural and finishing components, leading to project abandonment mid-construction. This paper validates a parametric, geometry-aware cost estimation model via the GhanaHousePlanner (GHP) platform. The model provides self-builders with itemised bills of quantities (BoQ) reflecting the true cost of code-compliant construction in Ghana. The GHP model uses seven calculation modules: foundation, blockwork, cement, structural steel, roofing, plumbing, and electrical. It features a primary geometry-based mode and a formula-based fallback. Accuracy was tested using three case studies (75, 120, and 200 per-square-metre homes) benchmarked against February 2026 market prices in Greater Accra.GHP estimates (GHS 519,000 to GHS 1,398,000) were 29 to 98 per cent higher than typical informal quotes. This gap arises from the omission of structural steel (Y16 rebar), plastering, floor screed, and full services in informal estimates. Findings confirm that per-square-metre rates rarely cover the requirements for a fully completed, code-compliant building. The GHP model offers a transparent, auditable alternative to informal quoting. Despite material price volatility and labour market informality, the tool provides a framework for improving cost predictability and reducing project stalling in the sub-Saharan African housing market.

Visit

arxiv.org

Languages

Ga

Tags

Human-Computer Interaction

Similar

DEVELOPMENT AND VALIDATION OF A CONSTRUCTION COST INDEX-BASED PARAMETRIC COST ESTIMATING MODEL FOR BUILDING FINISHES IN RESIDENTIAL BUILDING PROJECTS: IMPLICATIONS FOR AFFORDABLE AND SUSTAINABLE HOUSING DEVELOPMENT IN SOUTH-WESTERN NIGERIAA PARAMETRIC COST ESTIMATING MODEL OF WALL FINISHES COST RELATIVE TO TOTAL CONSTRUCTION COST USING CONSTRUCTION COST INDICES OF RESIDENTIAL BUILDING PROJECTS IN SOUTH-WESTERN NIGERIADataset for "A parametric optimisation study of urban geometry design to assess outdoor thermal comfort."Using Intelligent Case-Based Reasoning (CBR) for Parametric Cost Estimating in ConstructionNEURAL NETWORK AND PROBABILTY BASED COST EXPECTATION LIMIT MODEL FOR RESIDENTIAL BUILDING COSTA template design and automated parametric model for sustainable corbel dwellings with interlocking blocks

DEVELOPMENT AND VALIDATION OF A CONSTRUCTION COST INDEX-BASED PARAMETRIC COST ESTIMATING MODEL FOR BUILDING FINISHES IN RESIDENTIAL BUILDING PROJECTS: IMPLICATIONS FOR AFFORDABLE AND SUSTAINABLE HOUSING DEVELOPMENT IN SOUTH-WESTERN NIGERIA

The dataset used in this study comprises two complementary data sources collected to develop and val

A PARAMETRIC COST ESTIMATING MODEL OF WALL FINISHES COST RELATIVE TO TOTAL CONSTRUCTION COST USING CONSTRUCTION COST INDICES OF RESIDENTIAL BUILDING PROJECTS IN SOUTH-WESTERN NIGERIA

Data Description Dataset Title Parametric Cost Estimating Model of Wall Finishes Cost Relative to

Dataset for "A parametric optimisation study of urban geometry design to assess outdoor thermal comfort."

This dataset supports the study on the effect of urban geometry parameters, namely, building heights

Using Intelligent Case-Based Reasoning (CBR) for Parametric Cost Estimating in Construction

Estimating project cost can be fairly challenging during the project's early stages due to the limit

NEURAL NETWORK AND PROBABILTY BASED COST EXPECTATION LIMIT MODEL FOR RESIDENTIAL BUILDING COST

The aim of this study is to develop a system that could be described as Cost Expectancy Limit Model

A template design and automated parametric model for sustainable corbel dwellings with interlocking blocks

Existing approaches to sustainable dwellings often involve high-tech equipment and skilled workers,