Logo Lanfrica
  • Home
  • Atlas
  • Insights
  • Docs
  • Sign in

© 2026 Lanfrica. All rights reserved. All copyrights of the resources shown on the Lanfrica website belong to the original copyright holders, unless explicitly stated otherwise.

Comparative Methodological Evaluation and Time-Series Forecasting for Cost-Effectiveness in Rwanda's Power-Distribution Infrastructure (2000–2026)

Domain:

environment and energy
Creator:
MukUwiUwaNku
Publisher:
Zenodo
Host:avatar

{ "background": "Power-distribution infrastructure in developing nations requires robust, cost-effective planning methodologies. Existing approaches often lack integrated, long-term forecasting models tailored to specific regional constraints and equipment lifecycles.", "purpose and objectives": "This study conducts a comparative methodological evaluation of equipment systems and develops a bespoke time-series forecasting model to measure and project cost-effectiveness for national power-distribution infrastructure.", "methodology": "A comparative analysis of transformer and switchgear systems was performed using historical operational and cost data. A seasonal autoregressive integrated moving average (SARIMA) model, specified as $\\phi(B)\\Phi(B^s)\\nabla^d\\nabla^Ds yt = \\theta(B)\\Theta(B^s)\\epsilon_t$, was developed for forecasting. Model diagnostics included analysis of robust standard errors to account for heteroskedasticity.", "findings": "The forecasting model indicates a projected 22% reduction in total lifecycle costs per kilometre of network for the recommended equipment portfolio over a 25-year period. Comparative analysis identified specific switchgear technologies as having superior long-term cost-performance ratios under local operational conditions.", "conclusion": The integrated methodological framework provides a more reliable tool for long-term infrastructure investment planning than previous static models, demonstrating significant potential for cost optimisation.", "recommendations": "Infrastructure planners should adopt the developed forecasting model for capital investment appraisals. A phased transition towards the identified high-performance equipment portfolio is recommended to maximise future cost savings.", "key words": "infrastructure planning, lifecycle costing, SARIMA modelling, power distribution, cost-effectiveness, forecasting", "contribution statement": "This paper presents a novel integrated methodology combining comparative equipment evaluation with a bespoke time-series forecasting model, providing a new decision-support tool for engineering economists and infrastructure planners." } ``` Background Power-distribution infrastructure in developing nations requires robust, cost-effective planning methodologies. Existing approaches often lack integrated, long-term forecasting models tailored to specific regional constraints and equipment lifecycles. Purpose and objectives This study conducts a

Visit

doi.org

Tags

Power-distribution infrastructureTime-series forecastingCost-effectiveness analysisSub-Saharan AfricaComparative methodologyEngineering economics

Licenses

info:eu-repo/semantics/openAccessCreative Commons Attribution 4.0 Internationalhttps://creativecommons.org/licenses/by/4.0/legalcode

Similar

A Time-Series Forecasting Model for Risk Reduction in Rwanda's Power-Distribution Infrastructure: A Policy Analysis, 2000–2026A Time-Series Forecasting Model for the Cost-Effectiveness of South African Municipal Infrastructure Asset Systems: A Methodological Evaluation (2000–2026)Methodological Evaluation and Time-Series Forecasting for Cost-Effectiveness in Senegalese Manufacturing SystemsTime-Series Forecasting Model Evaluation for Cost-Effectiveness of Power-Distribution Equipment Systems in South AfricaMethodological Evaluation and Time-Series Forecasting for Industrial Machinery Fleet Reliability in Ethiopia (2000–2026)Methodological Evaluation and Time-Series Forecasting for Manufacturing Plant Efficiency Gains in Ethiopia (2000–2026)

A Time-Series Forecasting Model for Risk Reduction in Rwanda's Power-Distribution Infrastructure: A Policy Analysis, 2000–2026

{ "background": "Rwanda's power-distribution infrastructure faces significant reliability c

A Time-Series Forecasting Model for the Cost-Effectiveness of South African Municipal Infrastructure Asset Systems: A Methodological Evaluation (2000–2026)

{ "background": "Municipal infrastructure asset systems in South Africa face significant ch

Methodological Evaluation and Time-Series Forecasting for Cost-Effectiveness in Senegalese Manufacturing Systems

{ "background": "Manufacturing systems in West Africa face persistent challenges in achievi

Time-Series Forecasting Model Evaluation for Cost-Effectiveness of Power-Distribution Equipment Systems in South Africa

The field of engineering in South Africa has identified a need to evaluate the cost-effecti

Methodological Evaluation and Time-Series Forecasting for Industrial Machinery Fleet Reliability in Ethiopia (2000–2026)

Industrial machinery fleets in developing economies face unique reliability challenges due

Methodological Evaluation and Time-Series Forecasting for Manufacturing Plant Efficiency Gains in Ethiopia (2000–2026)

The systematic measurement of efficiency gains in industrial settings is critical for susta