Construction Schedule Risk Assessment and Management Strategy for Foreign General Contractors Working in the Ethiopian Construction Industry

Record type:

paper
Creator:
MinMoh
Publisher:
MDP
Host:
Construction project schedule delay is a worldwide concern and especially severe in the Ethiopian construction industry. This study developed a Construction Schedule Risk Assessment Model (CSRAM) and a management strategy for foreign general contractors (FGCs). 94 construction projects with schedule delay were collected and a questionnaire survey of 75 domain experts was conducted to systematically select 22 risk factors. In CSRAM, the artificial neural network (ANN) inference model was developed to predict the project schedule delay. Integrating it with the Garson algorithm (GA), the relative weights of risk factors with rankings were calculated and identified. For comparison, the Relative Importance Index (RII) method was also applied to rank the risk factors. Management strategies were developed to improve the three highest-ranked factors identified using the GA (change order, corruption/bribery, and delay in payment), and the RII (poor resource management, corruption/bribery, and delay in material delivery). Moreover, the improvement results were used as inputs for the trained ANN to conduct a sensitivity analysis. The findings of this study indicate that improvements in the factors that considerably affect the construction schedule can significantly reduce construction schedule delays. This study acts as an important reference for FGCs who plan to enter or work in the Ethiopian construction industry.

Visit

doi.org

Languages

Amharic

Licenses

https://creativecommons.org/licenses/by/4.0/

Similar

Diffusion of artificial intelligence adoption in modular construction for effective risk management in the construction industryDEVELOPMENT OF FUZZY DECISION MODEL FOR ETHIOPIAN CONSTRUCTION CONTRACTORS SELECTIONThe General Understanding Of Risk In Construction Industry In Ghana: The Consultant Perspective.Challenges of Construction Scheduling Practice in Ethiopian Construction IndustrySustainable Development and Risk Management in Road Construction Industry in NigeriaEvaluating credit accessibility predictors among small and medium contractors in the South African construction industry

Diffusion of artificial intelligence adoption in modular construction for effective risk management in the construction industry

Purpose This study aims to investigate the key risks and barriers associated w

DEVELOPMENT OF FUZZY DECISION MODEL FOR ETHIOPIAN CONSTRUCTION CONTRACTORS SELECTION

Choosing the right contractor to deliver a project in time, within budget and with better quality is

The General Understanding Of Risk In Construction Industry In Ghana: The Consultant Perspective.

The roll of consultants in construction industry cannot be under estimated, from project conception

Challenges of Construction Scheduling Practice in Ethiopian Construction Industry

Practice of construction scheduling includes tasks of developing, controlling, and communicating the

Sustainable Development and Risk Management in Road Construction Industry in Nigeria

Civil Engineering projects which include road construction pose a significant amount of risk due to

Evaluating credit accessibility predictors among small and medium contractors in the South African construction industry

The importance of small and medium construction enterprises (SMEs) in the South African economy has