Logo Lanfrica
  • Home
  • Atlas
  • Insights
  • Docs
  • Sign in

© 2026 Lanfrica. All rights reserved. All copyrights of the resources shown on the Lanfrica website belong to the original copyright holders, unless explicitly stated otherwise.

Forecasting Adoption Rates in Nigerian Power-Distribution Equipment Systems Using Time-Series Models

Domain:

environment and energy

Record type:

paper
Creator:
AgbUgw
Publisher:
Zenodo
Host:avatar

Nigeria's power distribution equipment (PDE) systems face significant challenges in terms of reliability and efficiency, with adoption rates varying across different regions. A comprehensive analysis using ARIMA (AutoRegressive Integrated Moving Average) model was conducted to forecast future adoption rates based on historical data from various regions. The ARIMA model predicted an average increase of 2.5% in PDE system adoption over the next five years, with a confidence interval ranging from 1.8% to 3.2%. This finding highlights the potential for targeted interventions to boost adoption rates. ARIMA models provide valuable insights into future trends and can aid policymakers in formulating strategies to enhance PDE system performance and user satisfaction. Policymakers should consider implementing ARIMA-based forecasting as a tool for planning and resource allocation, particularly focusing on regions with lower adoption rates. The maintenance outcome was modelled as $Y_{it}=\beta_0+\beta_1X_{it}+u_i+\varepsilon_{it}$, with robustness checked using heteroskedasticity-consistent errors.

Visit

doi.org

Tags

NigerianPower-DistributionEquipmentTime-SeriesForecastingRegionalAnalysis

Licenses

info:eu-repo/semantics/openAccessCreative Commons Attribution 4.0 Internationalhttps://creativecommons.org/licenses/by/4.0/legalcode

Similar

Power-Distribution Equipment Systems in Uganda: Forecasting Risk Reduction Using Time-Series ModelsTime-Series Forecasting Model for Measuring Adoption Rates of Power-Distribution Equipment in GhanaMethodological Evaluation of Power-Distribution Equipment Systems in South Africa Using Time-Series Forecasting Models for Efficiency MeasurementPower-Distribution Equipment Systems in Kenya: Time-Series Forecasting for Reliability AssessmentTime-Series Forecasting Model Evaluation of Power-Distribution Equipment Systems in TanzaniaMethodological Evaluation of Power-Distribution Equipment Systems in Ethiopia Using Time-Series Forecasting for Efficiency Measurement

Power-Distribution Equipment Systems in Uganda: Forecasting Risk Reduction Using Time-Series Models

Power distribution equipment (PDE) systems in Uganda are critical for ensuring reliable ele

Time-Series Forecasting Model for Measuring Adoption Rates of Power-Distribution Equipment in Ghana

The adoption rates of power-distribution equipment in Ghana have been inconsistent over tim

Methodological Evaluation of Power-Distribution Equipment Systems in South Africa Using Time-Series Forecasting Models for Efficiency Measurement

Power distribution equipment (PDE) systems in South Africa are critical for ensuring reliab

Power-Distribution Equipment Systems in Kenya: Time-Series Forecasting for Reliability Assessment

The reliability of power distribution systems in Kenya is critical for economic development

Time-Series Forecasting Model Evaluation of Power-Distribution Equipment Systems in Tanzania

Power distribution equipment systems in Tanzania are critical for ensuring reliable electri

Methodological Evaluation of Power-Distribution Equipment Systems in Ethiopia Using Time-Series Forecasting for Efficiency Measurement

The power distribution systems in Ethiopia face challenges related to efficiency and reliab