FPSO Experience in Deepwater West Africa - The Design One, Build Two Strategy

Record type:

media
Creator:
Lis
Publisher:
IPTC
Host:
Abstract The "Design One, Build Two" strategy has been employed for recent West Africa Deepwater Developments including the large Kizomba A and B developments in Angola and smaller EPS (Early Production System) Projects such as Yoho (Nigeria), Zafiro (Equatorial Guinea) and Xikomba (Angola).When properly managed and executed, the "Design One, Build Two" strategy reduces project cycle time and cost. Introduction The West Africa experience has identified key project conditions that are required for successful implementation of the "Design One, Build Two" strategy. These include use of the same:–Engineering design–Engineering and fabrication contractors–Fabrication yards–Vendors and suppliers–Project leadership teams–Project management systems From a project management point of view, the "Design One, Build Two" strategy requires different approaches as compared to traditional "stand-alone" projects. This paper explores some of these differences, including the:–Alignment of project schedules and execution plans–Required project management philosophy–Common safety and quality programs–A "No Design Change" philosophy–Use of duplicate engineering–Alignment of engineering and procurement deliverables with fabricator's construction methods–Use of real time capture of lessons learned The "Design One, Build Two" strategy, if properly planned, managed and executed, can optimize project economics for plays with multiple large developments that have similar geologic, geographic, economic and contractual elements. The learnings realized from West Africa Deepwater applications of the "Design One, Build Two" strategy can be applied in other large oil and gas development projects. Design One, Build Two Implementation The Kizomba A & B FPSO Example This paper uses construction of the Kizomba A & B Floating Production Storage Offload (FPSO) vessels as an example of the key success factors in making the "Design One, Build Two" strategy work. Cost and Schedule Impact For the Kizomba FPSOs, the "Design One, Build Two" strategy captured cost savings on the order of 10%. As illustrated in Figure 1, completion of Kizomba B tracked five months ahead of Kizomba A. Fabrication on the Kizomba A Project fell up to 30% behind schedule, resulting in multiple execution plan adjustments and multiple recovery plans. The Kizomba B FPSO consistently tracked the original execution plan, progress never fell behind the plan and no recovery plans were required.

Visit

doi.org

Similar

West Africa Deepwater Developments: Subsurface LearningsMbesese Build: An Experimental Experience Mbesese BuildWest Africa build gathers pace for The Conversation AfricaCost Effective Dry Tree Field Development in Deepwater West AfricaKey Initiatives Improve Production Testing Performance, Deepwater West AfricaMbesese Build: An Experimental Experience

West Africa Deepwater Developments: Subsurface Learnings

This article, written by Technology Editor Dennis Denney, contains highlights of paper OTC 16571, "W

Mbesese Build: An Experimental Experience Mbesese Build

The Same’ Polytechnic College is a proposed vocational training institution in the Kilimanjaro Regio

West Africa build gathers pace for The Conversation Africa

Cost Effective Dry Tree Field Development in Deepwater West Africa

Abstract An innovative, low cost, deepwater development concept has been devised

Key Initiatives Improve Production Testing Performance, Deepwater West Africa

Abstract Since 1996, ExxonMobil has conducted an extensive deepwater exploration /

Mbesese Build: An Experimental Experience

The Same’ Polytechnic College is a proposed vocational training institution in the Kilimanjaro Regio