Substantial capacity enhancement of mines in the Copper Belt of Zambia has required that geotechnical expertise and innovative solutions be applied while sinking new shafts from surface through sub soil (saprolitic) and incompetent rock to a considerable depth. One shaft is now in operation and boasts the tallest steel headgear in the south hemisphere.