Logo Lanfrica
  • Home
  • Atlas
  • Insights
  • Docs
  • Sign in

© 2026 Lanfrica. All rights reserved. All copyrights of the resources shown on the Lanfrica website belong to the original copyright holders, unless explicitly stated otherwise.

SASTPS/PowerLink-Ghana-2050-GWE-Team-46

Domain:

environment and energydigital infrastructure

Record type:

project
Creator:
SAS
Host:
GWE Challenge Demo Dashboard for PowerLink Ghana 2050 Implementation # PowerLink Ghana 2050 | Performance Dashboard **Team TechnoSaints Nexus (Team 46)** *2026 Siemens Energy "Girls with Energy" Challenge Submission* --- ## Project Overview **PowerLink Ghana 2050** is a community-scale energy ecosystem designed for the **Tamale–Savelugu Opportunity Corridor** in Northern Ghana. Our mission is to move beyond mere electricity access toward **opportunity access**—ensuring that energy supports education, healthcare, and agricultural resilience. This GitHub artifact is a live **KPI Performance Dashboard** that demonstrates how our team uses data to manage energy flow and prioritize critical community loads. ## Key Performance Indicators (KPIs) Our dashboard tracks four critical categories aligned with our project strategy: 1. **System Resilience:** Monitoring "WAPP-Ready" grid status and outage hours avoided. 2. **Community Impact:** Tracking AI learning lab uptime and clinic refrigeration continuity. 3. **Agri-Economy:** Measuring crop loss reduction and saved farmer income through cold storage. 4. **Equity & Climate:** Ensuring a high "Women in Energy" leadership ratio and tracking CO₂ displaced. ## The Technical Stack The PowerLink system is a 9-layer architectural solution]: * **Generation:** 75–100 MWdc Solar PV array. * **Storage:** 40–50 MW / 160–200 MWh Siemens Qstor™ BESS. * **Control:** Siemens SICAM-style microgrid controls to automate priority-load logic. * **Connectivity:** WAPP-Ready Link via the national 330kV transmission pathway. ## Funding & Implementation Our **$500M Blended Budget** includes a dedicated **$50M (10%) Community Benefit Fund**. Our phased roadmap ensures long-term sustainability: * **Years 0-3:** Pilot & Voice of the Customer (VoC) validation. * **Years 3-10:** Scaling hubs across the corridor. * **Years 10+:** Local ownership and utility partnership. --- ### Cybersecurity & Governance Innovation is not just making energy—it is **controlling it**. This dashboard includes access management protoco …

Visit

github.com