Implementing lean construction to improve quality and megaproject construction: a case study

Record type:

paper
Creator:
KhaMohSma
Publisher:
Eme
Host:
Purpose This paper aims to explore a framework for implementing Lean Construction (LC) to provide corrective actions for quality defects, customer dissatisfaction and value creation during the construction of megaprojects. Design/methodology/approach This paper presents a case study involving the construction of the Mohamed VI Tower in Morocco. It is the tallest tower in Africa, with 55 floors and a total height of 250 m. This study of the quality of the work and the involvement of the LC was carried out using the Define–Measure–Analysis–Improve–Control approach from Lean six sigma. It describes the Critical to Quality and analyses the root causes of quality defects, customer dissatisfaction and variation in the quality process. Findings Firstly, the results of this study map the causal factors of lack of quality as established in the literature. Secondly, the LC tools have reduced non-value-added sources of quality waste and, consequently, improved critical quality indicators. Research limitations/implications This document focuses on one part of the tower’s construction and is limited to a project case in a country where LC is rarely used. Originality/value This study reinforces the literature reviews, surveys and the small number of case studies that have validated the potential of LC and further clarifies future directions for the practical emergence of this quality improvement approach, especially for large-scale projects.

Visit

doi.org

Licenses

https://www.emerald.com/insight/site-policies