Key risk factors affecting renewable energy independent power producer (IPP) set-up projects in developing countries

Domain:

environment and energy
Creator:
MicSteBar
Publisher:
Eme
Host:
Purpose Sustained access to efficient electricity plays an essential role in improving living conditions of people and contributes to the economic development of the nation as a whole. Volta River Authority (VRA) mainly manages the generation plants (hydropower sources and thermal plants) alongside independent power producers (IPPs). Power generation in the country has been influenced by myriads of factors. Thus, the purpose of this study is to assess the key risk factors affecting renewable energy of IPPs set-up project in Ghana. Design/methodology/approach Quantitative approach was adopted for the study. Empirical investigation was carried out using the survey approach. The likelihood of occurrence of the risk and the degree of impact of same motivated the use of risk significance index to analyze the data and make deductions from the results. Findings From the study, three key risk factors have high level of severity, which include long and complex procedures for authorization of project activities, stability of the policy environment and ease of obtaining rights to land. These risks could be found in the business/strategic risks and policy/regulatory risks categories, respectively. A total of 25 key risk factors had moderate level of severity and 12 key risk factors have low level of severity on renewable energy IPP set up projects. Practical implications Top-ranked risk factors require maximum attention. The identified risks should be alleviated with strategies to reduce levels of severity by targeting either the likelihood of occurrence or the level of impact. This will serve as a catalyze to promoting renewable energy IPP set-up projects in Ghana. Originality/value Key contribution of the paper to the body of knowledge is demonstrated by the empirical evidence of the risks IPPs are likely to encounter in setting up renewable energy plants in Ghana. The distinctive attribute of this study is further demonstrated by the fact that it focused on the set-up stage, which is a critical stage in the renewable energy provision value chain.

Visit

doi.org

Licenses

https://www.emerald.com/insight/site-policies

Similar

The South African Renewable Energy Independent Power Producer Procurement Programme: A Review and Lessons LearnedThe Sustainability of Decentralised Renewable Energy Projects in Developing Countries: Learning Lessons from ZambiaENGINEERING INNOVATION IN DEVELOPING COUNTRIES: PATHWAYS TO RENEWABLE ENERGY ACCESSFactors Affecting mHealth Technology Adoption in Developing Countries: The Case of EgyptFactors Affecting the Deployment of Learning Analytics in Developing Countries: Case of EgyptRenewable energy and power: a review of the power sector reform and renewable energy law and policy nexus in Ghana

The South African Renewable Energy Independent Power Producer Procurement Programme: A Review and Lessons Learned

The South African Renewable Energy Independent Power Producer Procurement Programme (REIPPPP) is a c

The Sustainability of Decentralised Renewable Energy Projects in Developing Countries: Learning Lessons from Zambia

Decentralised renewable energy (RE) systems such as solar PV mini-grids (MG) are considered to be a

ENGINEERING INNOVATION IN DEVELOPING COUNTRIES: PATHWAYS TO RENEWABLE ENERGY ACCESS

As of 2024, 730 million people worldwide lacked electricity access, roughly eight in ten of them in

Factors Affecting mHealth Technology Adoption in Developing Countries: The Case of Egypt

Mobile health apps are seeing rapid growth in the potential to improve access to healthcare services

Factors Affecting the Deployment of Learning Analytics in Developing Countries: Case of Egypt

The higher education institutions in developing countries such as Egypt are challenged with the high

Renewable energy and power: a review of the power sector reform and renewable energy law and policy nexus in Ghana

The Ghanaian government initiated its policy on power sector reform in 1995 to engender both structu