Operating Voltage and Frequency Regime Validation of Grid Code Requirements in South Africa

Domain:

environment and energy
Creator:
GidAta
Publisher:
WILEY
Host:
South Africa first implemented rolling blackouts known as load shedding to protect the integrity and maintain stability of their ailing electrical grid over a decade ago. Since then, load shedding has become a daily occurrence, which South Africa plans to alleviate through the addition of grid-connected renewable generation. Significant renewable energy (RE) additions can however negatively affect a grid, prompting South Africa to develop RE-specific grid code requirements as mitigation. Given this strategy to address the country’s supply challenges using RE, and the still unknown effects of the country’s aggressive RE integration planned, South Africa must perform the necessary simulations tailored to the country’s unique grid conditions, and local RE-specific grid code requirements to ensure a RE-driven solution are indeed viable. Prompted by the lack of a suitably tailorable simulation platform, this paper proceeds to discuss the development of a tailorable grid code-guided renewable power plant (RPP) behavioral studies testbed. The testing methodology involves feeding grid disturbance event data to an RPP modeled after Eskom’s Sere wind farm in South Africa, which is operated in line with local RPP-specific grid code voltage and frequency requirements to assess the testbed’s grid code-guided RPP operating approach. Results show the testbed to effectively distinguish between grid code-specified no-fault, fault ride-through, and trip conditions, operating the simulated RPP accordingly. Consequently, as compared to comparable RE integration simulation platforms, the reviewed testbed has the potential of producing individualized results, owing to its tailorable grid, RPP, and incorporated grid code guiding specifications.

Visit

doi.org

Licenses

https://creativecommons.org/licenses/by/4.0/

Similar

Development and validation of a real-time testbed for renewable energy integration studies: South African grid code case studyVOLTAGE STABILITY IMPROVEMENT OF INTERCONNECTED GRID NETWORK USING ANFIS TECHNIQUEASSESSMENT OF SMART INVERTER INTEGRATION FOR VOLTAGE STABILITY IN NIGERIAN POWER GRIDOperating mines of South Africa. Feb 2026 version.Optimizing Voltage and Reactive Power Compensation in a Distribution Grid Using Metaheuristic TechniqueTemperature influence on pH-ISFET sensor operating in weak and moderate inversion regime: Model and circuitry

Development and validation of a real-time testbed for renewable energy integration studies: South African grid code case study

Purpose Despite South Africa’s ailing electrical grid, substantial renewable energy (RE) integrati

VOLTAGE STABILITY IMPROVEMENT OF INTERCONNECTED GRID NETWORK USING ANFIS TECHNIQUE

The paper examined a heavily stressed Nigeria 330kV network that operates closer to its thermal

ASSESSMENT OF SMART INVERTER INTEGRATION FOR VOLTAGE STABILITY IN NIGERIAN POWER GRID

Nigeria’s transition to solar energy presents notable voltage stability challenges due to the interm

Operating mines of South Africa. Feb 2026 version.

This dataset is the result of years of data collection on all the operating mines in South Africa. I

Optimizing Voltage and Reactive Power Compensation in a Distribution Grid Using Metaheuristic Technique

The availability of consistent, reasonably priced, and efficient power is a key determinant for

Temperature influence on pH-ISFET sensor operating in weak and moderate inversion regime: Model and circuitry

International audience Usually most pH-ISFET readout circuits, with temperature compe