Logo Lanfrica
  • Home
  • Atlas
  • Insights
  • Docs
  • Sign in

© 2026 Lanfrica. All rights reserved. All copyrights of the resources shown on the Lanfrica website belong to the original copyright holders, unless explicitly stated otherwise.

Optimizing the Design of Off-Grid Micro Grids Facing Interconnection with an Unreliable Central Grid Utilizing an Open-Source Simulation Tool

Domain:

environment and energy

Record type:

software
Creator:
Hof
Editor:
ZieBleBer
Publisher:
Zenodo
Host:avatar
While national grids are traditionally the predominant electrification projects of governments, recent multi-track plans also include the utilization of decentralized supply, such as off-grid micro grids. In their Energy for All Case aiming at full electrification by 2030, the IEA expects that 44 % of the households will gain electricity access by connecting to a micro grid. Uncertainty regarding national grid extension plans poses the main implementation barrier: Investors are especially cautious when the possibility of a future national grid extension to their project site implies the danger of rendering their whole investment to sunk costs. This can leave whole communities, otherwise feasible project sites, without electricity. However, there are successful examples of micro grid interconnection. But research into postinterconnection options, especially connected to often unreliable national grids, is rare. This study contributes to this gap. In order to evaluate possible post-interconnection options of previously off-grid micro grids with the arrival of both a reliable and an unreliable national grid, an open-source techno-economic optimization and simulation tool based on the Open Energy Modelling Framework (oemof) is developed. The energy system simulated can include grid connection, generator, wind power, PV panels and storage as well as inverters and rectifiers, supplying both DC and AC demand. The capacity and dispatch optimization can allow annual shortage or require a stability or minimal renewable share criterion to be fulfilled. From the optimization results, the simulation tool calculates the systems performance indicators: supply reliability, renewable share, autonomy, Net Present Value, Levelized Costs of Electricity and others. The tool is applied to and validated by a case study based on an electrification plan for the Nigeria’s Plateau State, analysing 544 potential project sites. The paradigm of micro grids becoming stranded assets after the arrival of a reliable grid is confirmed, if no appropriate policies are in place. If, however, the arriving grid has a low supply reliability, 17 % of the project locations could supply their communities at lower cost off-grid. The post-interconnection options of a micro grid, if the national grid was to arrive after five years of off-grid micro grid operation, are evaluated, considering: on-grid operation, capacity adaptation (refitting), transformation into a Small Power Producer (SPP) or Small Power Distributor (SPD) as well as reimbursement and abandonment. This reveals, that the micro grid operator would favour on-grid operation, if subsidies were provided, or reimbursement. In case of an arriving unreliable national grid however, the operator would choose reimbursement over continued operation. The micro grid operation would be terminated and communities left without reliable electricity supply. From an electrification planners perspective, continued on-grid operation of the micro grid would be preferable, as it is the least-cost option ensuring
reliable supply. Therefore, governments should consider the value of reliable supply and, next to reimbursements, develop subsidy schemes that encourage operators to continue operation, especially if the national grid experiences blackouts.

Visit

doi.orgzenodo.org

Tags

Micro GridsNational Grid ArrivalBlackoutsElectrification Planning

Licenses

Creative Commons Attribution 4.0 Internationalhttps://creativecommons.org/licenses/by/4.0/legalcodeOpen Accessinfo:eu-repo/semantics/openAccess

Similar

Design, Simulation, and Economic Optimization of an Off-Grid Photovoltaic System for Rural ElectrificationDesign and Simulation of an Off-Grid Photovoltaic System with Duty Cycle Prediction Using Neural Network ControllerRenewable Energy Micro-grids in Off-Grid Villages: Technological Adoption Among Women in Central Ivory Coast and MoroccoCLIENT II - Verbundvorhaben PeopleSuN: Optimierung von Off-Grid Stromversorgungssystemen in Nigeria; Abschlussbericht des Teilvorhabens PeopleSuN-TOOPS: Toolentwicklung zur Optimierung von Off-Grid Stromversorgungssystemen PeopleSuN: Optimizing off-grid electricity supply systems in Nigeria; PeopleSuN-TOOPS: Tool development for the optimization of off-grid power systemsDesign and Optimization of Reliable Off-Grid Solar PV–Battery Mini-Grids for Trading Centers in UgandaAn Efficient Method for Rural Electrification Grid Design

Design, Simulation, and Economic Optimization of an Off-Grid Photovoltaic System for Rural Electrification

Access to clean and affordable energy in rural African regions can contribute greatly to social deve

Design and Simulation of an Off-Grid Photovoltaic System with Duty Cycle Prediction Using Neural Network Controller

Global concerns over the inappropriate utilization of abundant renewable energy sources, the damages

Renewable Energy Micro-grids in Off-Grid Villages: Technological Adoption Among Women in Central Ivory Coast and Morocco

Renewable energy micro-grids are increasingly being deployed in off-grid villages across Af

CLIENT II - Verbundvorhaben PeopleSuN: Optimierung von Off-Grid Stromversorgungssystemen in Nigeria; Abschlussbericht des Teilvorhabens PeopleSuN-TOOPS: Toolentwicklung zur Optimierung von Off-Grid Stromversorgungssystemen PeopleSuN: Optimizing off-grid electricity supply systems in Nigeria; PeopleSuN-TOOPS: Tool development for the optimization of off-grid power systems

Das vom Bundesministerium für Bildung und Forschung geförderte Verbundvorhaben PeopleSuN - Optimieru

Design and Optimization of Reliable Off-Grid Solar PV–Battery Mini-Grids for Trading Centers in Uganda

This dataset presents a reliability-constrained simulation framework for a solar photovoltaic (PV)–b

An Efficient Method for Rural Electrification Grid Design

This paper investigates the optimization of the electricity grid network in rural community of Chegu