Realizing Value Through Focused HPHT Wells Intervention – The GAMMA Story

Record type:

paper
Creator:
O. T. J. C.
Publisher:
SPE
Host:
Abstract Gamma field, a brown onshore field in Niger Delta, Nigeria, has been producing oil and gas from normally hydrostatic pressured reservoirs for over 40 years. In 2017, a drilling campaign, targeting two HPHT natural gas reservoirs, kicked off as part of a gas development project to supply gas to the export gas market. This was the first of its kind in SPDC with seven wells planned to be drilled in a campaign mode to optimize project cost and timing. Being the first experience of drilling and completion of HPHT wells, there were several challenges encountered. Drilling challenges includes stuck pipes and loss of BHAs leading to several hole sidetracks. Completions challenges encountered were sustained high casing head pressures due to material corrosion and inflow impairment due to drilling and completions fluids used. A very significant challenge was the loss in well productivity of these high-rate HP gas wells due to the heavy barite-weighted drilling mud used to drill the reservoir section (for well control) was also left in hole for over 6 months before well clean up and production. Therefore, there was a mixed outcome from the drilling campaign, with over 50% of the wells experiencing a potential loss (the wells were tested to rates of 20 – 85MMscf/d against an expectation of over 100MMscf/d. The loss of productivity was adjudged to be due to the caked barite across the reservoir section below the Formation Isolation Valves (FIV) which plugged the sand control screens, resulting in very high drawdowns. Furthermore, two of the wells produced with high casing head pressures (High A-Annulus pressures) equaling the Maximum Annulus Allowable Surface Pressures (MAASP) of the wells and were closed in for well integrity reasons. As part of well productivity restoration, some premium bespoke cocktail of stimulation chemicals was selected (Imbazi, Oyeintonbra, et al, 2019) and with an effective well intervention program was designed and executed by joint team of local and global Experts. Currently, 5 of the 7 originally planned wells have been restored post well intervention and are producing above expectation. This paper discusses how the value of these wells are ultimately realized, what was done, what was achieved and how the learnings from the first drilling campaign were incorporated to achieve better results in later wells.

Visit

doi.org

Similar

Evaluation of Thermal Effects on Drillability in HPHT Wells in Niger DeltaResearch and Development: Utilization of Local Additive in the Cementation of HPHT Wells in NigeriaIntelligent MPD Set-Point Control for Narrow Windows: A Reinforcement Learning Framework for Automated Choke Control in Deepwater HPHT WellsDevelopment Support Communication in Practice: Towards Realizing Child Rights Through UNICEFRealizing Value From Implementing i-field™ in a Deepwater Greenfield in Offshore Nigeria DevelopmentRealizing the Intended Outcomes of Brown

Evaluation of Thermal Effects on Drillability in HPHT Wells in Niger Delta

Abstract Overcoming wellbore drilling instability presents one of the major challen

Research and Development: Utilization of Local Additive in the Cementation of HPHT Wells in Nigeria

Abstract Cementing of high temperature wells poses a big challenge and requires spe

Intelligent MPD Set-Point Control for Narrow Windows: A Reinforcement Learning Framework for Automated Choke Control in Deepwater HPHT Wells

Deep water high-pressure, high-temperature (HPHT) drilling in managed pressure drilling (MPD) offers

Development Support Communication in Practice: Towards Realizing Child Rights Through UNICEF

The author studied 6 years with Professor Joe Ascroft at the University of Iowa on a team defining p

Realizing Value From Implementing i-field™ in a Deepwater Greenfield in Offshore Nigeria Development

Realizing the Intended Outcomes of Brown

Equitable access to social mobility and advancement through education were among the intended outcom