Logo Lanfrica
  • Home
  • Atlas
  • Insights
  • Docs
  • Sign in

© 2026 Lanfrica. All rights reserved. All copyrights of the resources shown on the Lanfrica website belong to the original copyright holders, unless explicitly stated otherwise.

Scaling Zero-Shot Cross-Lingual Retrieval with Artificial Code-Switching Across Resource Levels

Domain:

natural language processing
Creator:
Ass
Publisher:
Zenodo
Host:avatar
Transferring information retrieval (IR) models from a high-resource language (typically English) to other languages in a zero-shot fashion has become a widely adopted approach. In this work, we show that the effectiveness of zero-shot rankers diminishes when queries and documents are present in different languages. Motivated by this, we propose to train ranking models on artificially code-switched data instead, which we generate by utilizing bilingual lexicons. To this end, we experiment with lexicons induced from (1) cross-lingual word embeddings and (2) parallel Wikipedia page titles. We use Research goal: How does the performance of zero-shot cross-lingual retrieval models trained on artificially code-switched data scale with increasing model size, measured by MRR@10 on MIRACL and per-language breakdowns across high-, medium-, and low-resource languages? Autonomous synthesis report generated by Assignee Research. Tribunal consensus score: 8.1/10. This report was generated autonomously by Assignee Research, an owner-gated autonomous research lab. The content synthesizes findings from peer-reviewed papers. Tribunal score: 8.1/10.

Visit

doi.orgzenodo.org

Tasks

code switchinginformation retrieval

Tags

performancezero-shotcross-lingualretrievalmodelstrainedartificiallycode-switched

Licenses

Creative Commons Attribution 4.0 Internationalhttps://creativecommons.org/licenses/by/4.0/legalcode

Similar

Scaling Zero-Shot Cross-Lingual Retrieval with Artificial Code-Switching Versus Parallel Data in Low-Resource SettingsArtificial Code-Switching in Zero-Shot Cross-Lingual Retrieval PerformanceZero-Shot Cross-Lingual Retrieval Degradation on Low-Resource Languages via Artificial Code-SwitchingXLM-R Zero-Shot Cross-Lingual Retrieval Performance with Artificial Code-Switching TrainingZero-Shot Cross-Lingual Retrieval Performance with Artificial Code-Switching Noise in Low-Resource Language PairsScalability of Artificial Code-Switching for Zero-Shot Cross-Lingual Retrieval in Low-Resource Languages

Scaling Zero-Shot Cross-Lingual Retrieval with Artificial Code-Switching Versus Parallel Data in Low-Resource Settings

Transferring information retrieval (IR) models from a high-resource language (typically English) to

Artificial Code-Switching in Zero-Shot Cross-Lingual Retrieval Performance

Transferring information retrieval (IR) models from a high-resource language (typically English) to

Zero-Shot Cross-Lingual Retrieval Degradation on Low-Resource Languages via Artificial Code-Switching

Transferring information retrieval (IR) models from a high-resource language (typically English) to

XLM-R Zero-Shot Cross-Lingual Retrieval Performance with Artificial Code-Switching Training

Transferring information retrieval (IR) models from a high-resource language (typically English) to

Zero-Shot Cross-Lingual Retrieval Performance with Artificial Code-Switching Noise in Low-Resource Language Pairs

Transferring information retrieval (IR) models from a high-resource language (typically English) to

Scalability of Artificial Code-Switching for Zero-Shot Cross-Lingual Retrieval in Low-Resource Languages

Transferring information retrieval (IR) models from a high-resource language (typically English) to