Application of a fuzzy set ranking method for project contingency estimating

Type de record:

paper
Créateur:
MagS BSam
Hôte:avatar
A construction project is, no doubt, a risk-inherent endeavor. Industry practitioners have long been dealing with the project risks through number of means, most notably the adding of contingency amounts to their base cost estimates to account for the unfavorable future events. This is considered a fundamental risk mitigation practice in construction projects. Whenever a construction company fails to satisfactorily estimate the contingency amount, it risks getting the project on one hand and endangers its presumptive profits on the other hand. This may even lead, in some instances, to stoppage of work and/or bankruptcy. This paper introduces an application of a fuzzy set ranking method for the estimation of project contingencies. Fuzzy set ranking methods are generally based on the fuzzy sets theory developed by Lotfi Zadeh. The fundamentals of the fuzzy set ranking method adopted in this study have earlier been given in the literature. For practicality reasons, the method is being applied to the school building sector in Egypt. The selection of this particular sector is made due to the high level of standardization among the constructed facilities. Data for 30 construction projects in this sector were collected and used later, after proper preparation, for the calculation purposes. The paper then elaborates on the use of Monte Carlo simulation for the validation of the obtained results. Finally, the paper reports on the difference between the results from the fuzzy ranking method and Monte Carlo simulation. The difference generally turned out to be within an acceptable range.

Visit

figshare.com

Tags

Building construction management and project planningEvolutionary computationConstruction industrybusiness riskcontingencycross impact method

Licenses

All rights reserved

Similaires

Application of fuzzy AHP method in prioritizing patients' needsA method for estimating maximum safe installable power for groundwater extraction with application to AfricaIntelligent Contingency Ranking of Nigeria's 330 KV Transmission Network Using Artificial Neural NetworkData set for Plantisc applicationA method for estimating lingual cavity volume in click consonantsAn econometric method for estimating population parameters from non-random samples: An application to clinical case finding

Application of fuzzy AHP method in prioritizing patients' needs

International audience Accessing a hospital through the emergency room (ER) has becom

A method for estimating maximum safe installable power for groundwater extraction with application to Africa

International audience New groundwater development is a likely way to meet growing gl

Intelligent Contingency Ranking of Nigeria's 330 KV Transmission Network Using Artificial Neural Network

This research examines and prioritizes contingencies within Nigeria’s 330 KV transmission network, c

Data set for Plantisc application

Plant tissue culture is a collection of techniques used to maintain or grow plant cells, tissues or

A method for estimating lingual cavity volume in click consonants

A method for estimating lingual cavity volume in click consonants is presented. The upper edge of th

An econometric method for estimating population parameters from non-random samples: An application to clinical case finding

The problem of sample selection complicates the process of drawing inference about populations. Sele