BIM for Fast-track Construction under COVID-19 Circumstances: A Comparative Case Study in the African Context

Type de record:

paper
Créateur:
HanDalSal
Éditeur:
Eas
Hôte:
Under COVID-19 circumstances, the majority of Architecture, Engineering, and Construction (AEC) contractors around the world found themselves handcuffed, facing the sudden restrictive measures to be mandatorily applied in worksites imposing a necessary shift in the typical practices for building. Building Information Modeling (BIM) technologies associated with fast-track construction were found to be an efficient solution for several countries to quickly build health care facilities to meet the rising number of COVID-19 cases. Based on a comparative study, this paper explores the applicability of BIM-based building operation for fast-track construction in the African context and discusses the associated challenges as well as needed elements for its implementation. The study reveals that to reach the full performances of BIM, the African AEC industry has to mainly handle the aspects related to skills, bidding, payment, infrastructure, and availability of local construction materials and technologies.

Visit

doi.org

Similaires

Factors associated with COVID-19: a comparative case-control study in Benin.A proposal to facilitate BIM implementation across the South African construction industryTB Fast Track datasetCOVID-19 case management: The policy model in Morocco contextOptimized lockdown strategies for curbing the spread of COVID-19: A South African case studyA simple and fast spectroscopy-based technique for Covid-19 diagnosis

Factors associated with COVID-19: a comparative case-control study in Benin.

Introduction: Although there are several previous publications related to risk factors of COVID-19 i

A proposal to facilitate BIM implementation across the South African construction industry

The value of Building Information Modelling (BIM) has been noted by the global construction industry

TB Fast Track dataset

The TB Fast Track dataset was produced as part of an open-label, pragmatic cluster-randomised trial,

COVID-19 case management: The policy model in Morocco context

Abstract Background Based on the updated s

Optimized lockdown strategies for curbing the spread of COVID-19: A South African case study

To curb the spread of COVID-19, many governments around the world have implemented tiered lockdowns

A simple and fast spectroscopy-based technique for Covid-19 diagnosis

International audience Abstract The coronavirus pandemic, which appeared in Wuhan, Ch