This paper explores electricity planning strategies in South Sudan under future conflict uncertainty. A stochastic energy system optimization model that explicitly considers the possibility of armed conflict leading to electric power generator damage is presented. Strategies that hedge against future conflict have the greatest economic value in moderate conflict-related damage scenarios by avoiding expensive near-term investments in infrastructure that may be subsequently damaged. Model results show that solar photovoltaics can play a critical role in South Sudan's future electric power system. In addition to mitigating greenhouse gas emissions and increasing access to electricity, this analysis suggests that solar can be used to hedge against economic losses incurred by conflict. While this analysis focuses on South Sudan, the analytical framework can be applied to other conflict-prone countries. 30 pages, 9 figures

Visit

doi.orgarxiv.org

Tags

Physics and Society (physics.soc-ph)FOS: Physical sciencesFOS: Physical sciences

Licenses

arXiv.org perpetual, non-exclusive licensehttp://arxiv.org/licenses/nonexclusive-distrib/1.0/

Similaires

TemoaProject: Building conflict uncertainty into electricity planning: A South Sudan case study

TemoaProject: Building conflict uncertainty into electricity planning: A South Sudan case study

This zenodo archive includes the Temoa code and data used to produce the publication Patankar et al.