Logo Lanfrica
  • Accueil
  • Atlas
  • Analyses
  • Documentation
  • Sign in

© 2026 Lanfrica. Tous droits réservés. Tous les droits d'auteur des ressources affichées sur le site Web Lanfrica appartiennent aux détenteurs de droits d'auteur d'origine, sauf indication contraire explicite.

Challenges of Construction Scheduling Practice in Ethiopian Construction Industry

Type de record:

paper
Créateur:
GirAbd
Éditeur:
Eth
Hôte:avatar
Practice of construction scheduling includes tasks of developing, controlling, and communicating the schedule to the concerned parties. This study focuses on identifying the major challenges of construction scheduling practice in Ethiopia. Questionnaire survey was used to collected data from selected construction professionals and one hundred fifty-five valid responses were collected. The data was checked for construct validity and internal reliability. Exploratory factor analysis was conducted to identify challenges of construction scheduling practice. The factor analysis has resulted in four challenge affecting construction scheduling practice: (1) lack of top management commitment, (2) lack of scheduling knowledge and nature of construction projects, (3) lack of scheduling standards and (4) reliable resource scheduling in a resource constrained environment. One sample T-test was conducted to evaluate relative significance of the challenges, and reliable resource scheduling in a resource constrained environment was found to be the most challenging factor of construction scheduling practice. Developing countries’ construction industry faces major uncertainties in the resource availability and quality aspect than developed countries. Hence, it is important to understand the operating environment and consider the situation to improve the construction scheduling practice.

Visit

doi.orgjournals.hu.edu.et

Languages

Amharic

Tags

Challenges in ConstructionConstruction SchedulingResource Scheduling

Licenses

Creative Commons Attribution 4.0 Internationalhttps://creativecommons.org/licenses/by/4.0/legalcode

Similaires

Lean construction implementation in the Moroccan construction industryBuilding information modeling: implementation challenges in the Malawian construction industryConstruction Schedule Risk Assessment and Management Strategy for Foreign General Contractors Working in the Ethiopian Construction IndustryConstruction 4.0: The Future of the Construction Industry in South AfricaYield Strength and Ductility Analysis on Steel Reinforcing Bars Used in Ethiopian Construction IndustryA multivariate regression approach toward prioritizing BIM adoption barriers in the Ethiopian construction industry

Lean construction implementation in the Moroccan construction industry

Purpose Lean construction provides innovative practices to manage construction projects while redu

Building information modeling: implementation challenges in the Malawian construction industry

Building information modelling is making waves in the global built environment, improving the archit

Construction Schedule Risk Assessment and Management Strategy for Foreign General Contractors Working in the Ethiopian Construction Industry

Construction project schedule delay is a worldwide concern and especially severe in the Ethiopian co

Construction 4.0: The Future of the Construction Industry in South Africa

The construction industry is a renowned latecomer to the efficiency offered by the adoption

Yield Strength and Ductility Analysis on Steel Reinforcing Bars Used in Ethiopian Construction Industry

A multivariate regression approach toward prioritizing BIM adoption barriers in the Ethiopian construction industry

Purpose Building information modeling (BIM) is a process of creating an intelligent virtual model i