Delay Factors and Time-Cost Performance of Construction Projects in Gaborone City Council, Botswana

Créateur:
AdeKea
Éditeur:
Kas
Hôte:
The problem of delays in the construction industry is a global phenomenon and the construction industry in Botswana is not an exception. The objectives of this study were to confirm the presence of significant delay in GCC projects; to identify and rank the perceived delay causes; and construct a Bromilow-type time-cost model for the council’s projects. The study made use of archival data and questionnaire survey soliciting the perceived causes and effects of delay from the clients, consultants, and contractors that are associated with GCC projects. Chi-square statistical method was employed to prove the presence of statistically significant delay in the council’s project. About 150 respondents drawn from three client organizations, five consulting firms and 23 construction contracting companies participated in the survey to rank the perceived causes of delay. The study identified 10 most important causes of delay from a list of twenty eight different causes and six different effects of delay. The ten most important causes are: contractor’s improper planning, contractor's poor site management, inadequate contractor experience, inadequate client's finance and payments for completed work, problems with subcontractors, shortage in material, labor supply, equipment availability and failure, lack of communication between parties, and mistakes during the construction stage. The six main effects of delay were: time overrun cost overrun, disputes, arbitration, litigation and total abandonment. In addition, archival data were used to establish the time-cost relationship of the council’s projects using Bromilow’s model. The derived relationship was given by Time = 1.18Cost0.361861. The adjusted R2 of the model was 0.817812 showing that the model had high predictability. It was concluded that the results of this study can be of immense assistance to the stakeholders of GCC projects in terms of planning future projects and better understanding of the dynamics of project management as lessons for reducing the incidences of project delay and high cost.

Visit

doi.org

Similaires

CCTV placement in Gaborone City, BotswanaUse of cybercafés: study of Gaborone City, BotswanaSignificant Factors Causing Delay of Ethiopian Road Construction Projects performing by Foreign General ContactorsModeling Delay Percentage of Construction Projects in Egypt Using Statistical-Fuzzy ApproachPlanners’ roles and techniques in developing sustainable "eco-City": The case of gaborone, BotswanaExploring the Components of Cost on Construction Projects

CCTV placement in Gaborone City, Botswana

Public surveillance technology through the installation of Closed-Circuit Television cameras (CCTV)

Use of cybercafés: study of Gaborone City, Botswana

This paper reports on a study to determine the use of cybercafés in Gaborone, Botswana. The study in

Significant Factors Causing Delay of Ethiopian Road Construction Projects performing by Foreign General Contactors

Following the booming of the Ethiopian construction industry, a number of Foreign General Contractor

Modeling Delay Percentage of Construction Projects in Egypt Using Statistical-Fuzzy Approach

Planners’ roles and techniques in developing sustainable "eco-City": The case of gaborone, Botswana

Efforts to incorporate sustainability principles into city planning demands new relationships betwee

Exploring the Components of Cost on Construction Projects

This study examines the components of construction projects and whether there are construction resou