Logo Lanfrica
  • Accueil
  • Atlas
  • Analyses
  • Documentation
  • Sign in

© 2026 Lanfrica. Tous droits réservés. Tous les droits d'auteur des ressources affichées sur le site Web Lanfrica appartiennent aux détenteurs de droits d'auteur d'origine, sauf indication contraire explicite.

Domain adaptation effects on zero-shot cross-lingual retrieval in MIRACL across resource levels

Domaine:

natural language processing

Type de record:

paper
Créateur:
Ass
Éditeur:
Zenodo
Hôte:avatar
Information retrieval across different languages is an increasingly important challenge in natural language processing. Recent approaches based on multilingual pre-trained language models have achieved remarkable success, yet they often optimize for either monolingual, cross-lingual, or multilingual retrieval performance at the expense of others. This paper proposes a novel hybrid batch training strategy to simultaneously improve zero-shot retrieval performance across monolingual, cross-lingual, and multilingual settings while mitigating language bias. The approach fine-tunes multilingual lang Research goal: How does domain adaptation using the hybrid batch training strategy influence the zero-shot cross-lingual retrieval performance on the MIRACL benchmark when evaluated on low-resource languages compared to high-resource languages? Autonomous synthesis report generated by Assignee Research. Tribunal consensus score: 7.5/10. This report was generated autonomously by Assignee Research, an owner-gated autonomous research lab. The content synthesizes findings from peer-reviewed papers. Tribunal score: 7.5/10.

Visit

doi.orgzenodo.org

Tasks

information retrievaltransfer learning

Tags

domainadaptationhybridbatchtrainingstrategyinfluencezero-shot

Licenses

Creative Commons Attribution 4.0 Internationalhttps://creativecommons.org/licenses/by/4.0/legalcode

Similaires

Domain Adaptation Effects on Zero-Shot Cross-Lingual Retrieval Robustness in Low-Resource LanguagesHybrid Batch Training Effects on Zero-Shot Cross-Lingual Retrieval in MIRACL Low-Resource Language PairsHybrid Batch Training Effects on Zero-Shot Cross-Lingual Retrieval Accuracy in MIRACL under Low-Resource ConstraintsScaling Zero-Shot Cross-Lingual Retrieval with Artificial Code-Switching Across Resource LevelsSynergistic monolingual and cross-lingual optimization in zero-shot retrieval across low-resource language pairs in MIRACLPerformance of Artificially Code-Switched Models in Zero-Shot Cross-Lingual Retrieval Across Resource Levels

Domain Adaptation Effects on Zero-Shot Cross-Lingual Retrieval Robustness in Low-Resource Languages

Transferring information retrieval (IR) models from a high-resource language (typically English) to

Hybrid Batch Training Effects on Zero-Shot Cross-Lingual Retrieval in MIRACL Low-Resource Language Pairs

Information retrieval across different languages is an increasingly important challenge in natural l

Hybrid Batch Training Effects on Zero-Shot Cross-Lingual Retrieval Accuracy in MIRACL under Low-Resource Constraints

Information retrieval across different languages is an increasingly important challenge in natural l

Scaling Zero-Shot Cross-Lingual Retrieval with Artificial Code-Switching Across Resource Levels

Transferring information retrieval (IR) models from a high-resource language (typically English) to

Synergistic monolingual and cross-lingual optimization in zero-shot retrieval across low-resource language pairs in MIRACL

Information retrieval across different languages is an increasingly important challenge in natural l

Performance of Artificially Code-Switched Models in Zero-Shot Cross-Lingual Retrieval Across Resource Levels

Transferring information retrieval (IR) models from a high-resource language (typically English) to