Logo Lanfrica
  • Accueil
  • Atlas
  • Analyses
  • Documentation
  • Sign in

© 2026 Lanfrica. Tous droits réservés. Tous les droits d'auteur des ressources affichées sur le site Web Lanfrica appartiennent aux détenteurs de droits d'auteur d'origine, sauf indication contraire explicite.

Fuzzy quantitative risk allocation model (FQRAM) to guide decision-making on risk allocation in Ghanaian public-private partnership (PPP) power projects

Domaine:

environment and energy

Type de record:

paper
Créateur:
AugDe-EdwDav
Éditeur:
Eme
Hôte:
Purpose Public-private partnership (PPP) power projects are associated with varying risk factors. This paper aims to develop a fuzzy quantitative risk allocation model (QRAM) to guide decision-making on risk allocation in PPP power projects in Ghana. Design/methodology/approach A total of 67 risk factors and 9 risk allocation criteria were established from literature and ranked in a two-round Delphi survey using questionnaires. The fuzzy synthetic evaluation method was used in developing the risk allocation model. Findings The model’s output variable is the risk allocation proportions between the public body and private body based on their capability to manage the risk factors. Out of the 37 critical risk factors, the public sector was allocated 12 risk factors with proportions = 50%, while the private sector was allocated 25 risk factors with proportions = 50%. Originality/value To the best of the authors’ knowledge, this research presents the first attempt in Ghana at endeavouring to develop a QRAM for PPP power projects. There is confidence in the model to efficiently allocate risks emanating from PPP power projects.

Visit

doi.org

Licenses

https://www.emerald.com/insight/site-policies

Similaires

Application of Fuzzy Risk Allocation Decision Model for Improving the Nigerian Public–Private Partnership Mass Housing Project ProcurementReasons for entering into Ghanaian public-private partnership (PPP) power projectsLexicometric and Sentiment-Based Insights into Risk Allocation: A Qualitative Study of Moroccan Public–Private–Partnership ProjectsDeveloping holistic financial risk management to optimize financial performance of Public-Private Partnership (PPP) projects in GhanaA Fuzzy Mathematical Model with Group Decision-Making to Solve the Water Allocation Problem: Tunisian CaseRisk efficiency of optimal water allocation within a single- and multi-stage decision-making framework

Application of Fuzzy Risk Allocation Decision Model for Improving the Nigerian Public–Private Partnership Mass Housing Project Procurement

Public–Private Partnership (PPP) procurement is a relatively new approach in Nigeria’s housing secto

Reasons for entering into Ghanaian public-private partnership (PPP) power projects

Purpose In comparison to other countries, power generation in Sub-Saharan Africa is poor. The dema

Lexicometric and Sentiment-Based Insights into Risk Allocation: A Qualitative Study of Moroccan Public–Private–Partnership Projects

This research addresses a critical gap in the Public–Private Partnership (PPP) research field by ana

Developing holistic financial risk management to optimize financial performance of Public-Private Partnership (PPP) projects in Ghana

This survey aims to validate the comprehensiveness and practicability of the results from the factor

A Fuzzy Mathematical Model with Group Decision-Making to Solve the Water Allocation Problem: Tunisian Case

Risk efficiency of optimal water allocation within a single- and multi-stage decision-making framework

The South African government has put legislation in place to exercise better control over irrigation