Keuya/garissa-solar-finance-model

Domaine:

environment and energy

Type de record:

model
Créateur:
Keu
Hôte:
Lender-grade project finance model for a 10 MW solar PV plant in Kenya: DSCR/LLCR, scenarios, sensitivities, investment memo # Garissa Solar — 10 MW Project Finance Model (Kenya) A lender-style project finance model for a 10 MW solar PV plant in Garissa, Kenya. It links technical assumptions (yield, degradation, availability) to the numbers a credit committee actually looks at: **equity IRR, DSCR, LLCR, LCOE and payback** — under base, downside and upside cases. The original Excel model (`Garissa Solar Model.xlsx`) is kept for reference; the Python model extends it with a debt layer, tax, degradation and scenario logic. ## Headline results | Metric | Base | Downside | Upside | |---|---|---|---| | Project IRR (post-tax) | 16.3% | 9.4% | 18.0% | | **Equity IRR** | **29.4%** | 7.6% | 37.4% | | NPV @ 10% (USD m) | 3.32 | (0.33) | 3.98 | | Min DSCR | 1.61x | **0.86x** | 1.96x | | Avg DSCR | 1.88x | 1.15x | 2.25x | | LLCR | 1.93x | 1.22x | 2.30x | | Equity payback | 4 yrs | 17 yrs | 3 yrs | | LCOE (real) | $0.071/kWh | $0.088/kWh | $0.066/kWh | ## What a lender would challenge 1. **The tariff is the whole story.** At $0.12/kWh the project clears every hurdle; recent Kenyan solar procurement has cleared well below $0.10. At $0.10 with a CAPEX overrun, **min DSCR falls to 0.86x — the downside case is not bankable at 70% gearing.** Debt would be resized off the downside, not the base case (roughly 50–55% gearing to hold ≥1.20x through the downside). 2. **Offtaker credit.** Kenya Power payment delays are the real risk behind the flat USD tariff; a lender would require an escrow/letter-of-credit structure and would probe deemed-energy and curtailment provisions in the PPA. 3. **Yield basis.** The model runs P50; debt sizing uses P90 (−7% here). The tornado shows CAPEX and tariff dominate — yield matters less than commercial terms. 4. **FX.** Tariff is USD but land, labour and part of OPEX are KES; the model escalates OPEX at USD CPI in the base and 4% in the downside as a proxy. ## Assumptions register (base case) | Block | Assumption | Value | Source | |---|---|---|---| | Technical | Ca …

Visit

github.com