# Renewable-energy site screening
A small PostGIS project that runs a first-pass spatial screen for candidate solar and wind sites in South Africa — checking grid proximity and protected-land conflicts, then tagging each site with its real municipality.
> Built to reinforce PostGIS / spatial-SQL fundamentals — a focused learning exercise, not a production system. See Data and limitations.
## What it does
Renewable siting needs two early checks: is there a nearby grid connection, and is the land clear of protected areas? This project runs that screen against South African data — candidate sites, substations, and exclusion zones — and outputs a `PASS / REJECT / REVIEW` verdict per site, each tagged with its real municipality (loaded from an official shapefile).
## What it covers
| Step | Concept | Query |
|---|---|---|
| 0 | Typed geometry + GiST indexes | `geometry(Point/Polygon, 4326)` |
| 1 | Distance | `ST_DWithin` on `geography` — substations within 30 km |
| 2 | Nearest-neighbour join | `LATERAL` + ` ` KNN operator |
| 3 | Containment | `ST_Contains` — sites inside exclusion zones |
| 4 | Projection vs. geography | same distance in degrees vs. `geography` vs. UTM 34S |
| 5 | Composite verdict | `PASS / REJECT / REVIEW` per site |
## Run it
Copy the env template and set your own password:
```bash
cp .env.example .env
```
Then:
```bash
docker compose up -d
./run.sh
```
Seeds the demo data, loads the real Municipal Demarcation Board boundary shapefile, and prints each site with its municipality and verdict.
`docker compose down` to tear down — there's no persistent volume, so `run.sh` re-seeds clean every run.
## Sample output
```
site | tech | municipality | verdict
-----------------+-------+---------------+-------------------------------
De Aar Wind | wind | Emthanjeni | PASS - screenable
Augrabies Solar | solar | Kai !Garib | REJECT - protected land
Prieska Solar | solar | Siyathemba | REVIEW - no grid within 30 km …