Logo Lanfrica
  • Accueil
  • Atlas
  • Analyses
  • Documentation
  • Sign in

© 2026 Lanfrica. Tous droits réservés. Tous les droits d'auteur des ressources affichées sur le site Web Lanfrica appartiennent aux détenteurs de droits d'auteur d'origine, sauf indication contraire explicite.

GSMR Coverage and Capacity Planning Awash-Woldia Rail Line

Domaine:

digital infrastructure

Type de record:

project
Créateur:
Abr
Éditeur:
Nat
Hôte:avatar
This thesis is intended to give a good understanding of GSMR radio network planning and perform a case study in Awash-Woldia rail line. It also considers future network implementation. In any cellular network, whether an expansion of the existing one or as a new technology to be deployed, the nominal planning of radio access network is considered as critical point. This is because it gives the first rough estimation to coverage and capacity. In this thesis the coverage estimation is done by considering the nature of the route inspected from Google Earth. The number of base stations required to cover a given suburban rail line is determined. Appropriate propagation model is also selected. The capacity planning is done only in the analysis part; because of the unavailability and difficulty of having the traffic digital data for railway systems. The analytical results are simulated using radio planning tool called Atoll. Atoll is chosen over other dimensioning tools like Excel-based software and MATLAB for its indepth input analysis, flexible working environment and being professional planning software. After integration of the results in the dimensioning tool, the work is reviewed and iterations are performed till the desired results are reached. The simulations show that it is quite evident the planned network provides satisfactory results especially in coverage performance. Finally, we have found that 48 GSMR BTSs with total capacity of 3.35Mbps for the entire Awash-Woldia rail line.

Visit

doi.orgnadre.ethernet.edu.et

Licenses

Creative Commons Attributionhttp://www.opendefinition.org/licenses/cc-byOpen Accessinfo:eu-repo/semantics/openAccess

Similaires

Power Line Communication Based Real Time Train Tracking System for Addis Ababa Light Rail TransitCoverage, Opportunity, and Challenges of Expanded Program on Immunization among 12–23-Month-Old Children in Woldia Town, Northeast Ethiopia, 2018trg-rail/africa_rail_networkthatstarryeyedgirl/Rail-Me_BEGraph Neural Network Encoder for Layout Planning and Scheduling in Line-less Mobile Assembly SystemsOptimising water allocation with hybrid machine learning–water evaluation and planning under climate and population pressure in Upper Awash–Akaki, Ethiopia

Power Line Communication Based Real Time Train Tracking System for Addis Ababa Light Rail Transit

In railway traffics the low friction between wheel and rail causes long braking distances, normally

Coverage, Opportunity, and Challenges of Expanded Program on Immunization among 12–23-Month-Old Children in Woldia Town, Northeast Ethiopia, 2018

Background . Each year, immunization averts an estimated 2–3 million deaths fro

trg-rail/africa_rail_network

An Open Source Rail Dataset For Africa # An Open Source Routable Rail Dataset For Africa The aim

thatstarryeyedgirl/Rail-Me_BE

Rail-me: A Django RESTful API for digitized train bookings from Abeokuta to Northern Nigeria, suppor

Graph Neural Network Encoder for Layout Planning and Scheduling in Line-less Mobile Assembly Systems

56. Conference on Manufacturing Systems, CIRP CMS, Cape Town, South Africa, 24 Oct 2023 - 26 Oct 202

Optimising water allocation with hybrid machine learning–water evaluation and planning under climate and population pressure in Upper Awash–Akaki, Ethiopia

ABSTRACT This study presents a hybrid approach combining machine learning (ML) a