Least-Cost Electrification Pathways for Universal Electricity Access in Rwanda: An OnSSET Modelling Analysis

Domaine:

environment and energygeospatial

Type de record:

paper
Créateur:
Nsekanabanga Jovine
Éditeur:
Zenodo
Hôte:avatar
Achieving universal electricity access by 2030 is a key objective of Rwanda's national development agenda. This study applies the Open-Source Spatial Electrification Tool (OnSSET) to evaluate least-cost electrification pathways under two scenarios: a Least-Cost Scenario and a Forced-Grid Scenario. Using 2024 geospatial, demographic, and electricity infrastructure data, the analysis estimates technology choices, investment requirements, generation capacity, and carbon emissions needed to achieve universal access. The results show that both scenarios can provide universal electricity access with approximately 2.28 million new connections, 309 MW of additional generation capacity, investments of about USD 1.59 billion, and very low carbon emissions. However, the Least-Cost Scenario is the preferred option, combining grid densification with stand-alone solar photovoltaic (PV) systems to achieve greater economic efficiency while minimizing reliance on mini-grids. The findings highlight the importance of integrating geospatial least-cost planning into national electrification strategies to support cost-effective investment decisions and Rwanda's transition toward a sustainable, low-carbon energy system.

Visit

doi.org

Licenses

Creative Commons Attribution 4.0 Internationalhttps://creativecommons.org/licenses/by/4.0/legalcode

Similaires

Geospatial Electrification Planning for Ghana Using OnSSET: A Least-Cost Pathway to Universal Electricity Access by 2030Least Cost Electrification Pathway for Electricity Access in the Niger Delta- An OnSSET Based ApproachLeast-Cost Universal Electricity Access for Bauchi and Plateau States in Nigeria by 2035 Using OnSSETComparison of Least-Cost Pathways towards Universal Electricity Access in Somalia over Different TimelinesPathways to Universal Electrification in Zambia by 2030 using OnSSET Modelling ToolLeast-Cost Electrification Planning for Nigeria Under Mission 300: A Geospatial Analysis Using OnSSET

Geospatial Electrification Planning for Ghana Using OnSSET: A Least-Cost Pathway to Universal Electricity Access by 2030

This report constitutes the outcome of a three-weeks capacity building activity on GEP-OnSSET as par

Least Cost Electrification Pathway for Electricity Access in the Niger Delta- An OnSSET Based Approach

 

This present

Least-Cost Universal Electricity Access for Bauchi and Plateau States in Nigeria by 2035 Using OnSSET

One of the key factors hindering the pace of electrification in Nigeria is the inadequacy of geospat

Comparison of Least-Cost Pathways towards Universal Electricity Access in Somalia over Different Timelines

Access to electricity is a prerequisite for development, included in both the Agenda for Sustainable

Pathways to Universal Electrification in Zambia by 2030 using OnSSET Modelling Tool

This presentation constitutes the outcome of a three-weeks capacity building activity on GEP-OnSSET

Least-Cost Electrification Planning for Nigeria Under Mission 300: A Geospatial Analysis Using OnSSET

This report constitutes the outcome of a three-weeks capacity building activity on GEP-OnSSET as par