Logo Lanfrica
  • Accueil
  • Atlas
  • Analyses
  • Documentation
  • Sign in

© 2026 Lanfrica. Tous droits réservés. Tous les droits d'auteur des ressources affichées sur le site Web Lanfrica appartiennent aux détenteurs de droits d'auteur d'origine, sauf indication contraire explicite.

Leveraging e-business technology for construction procurement improvement: Qualitative perspectives from Ghana

Domaine:

digital infrastructure

Type de record:

paper
Créateur:
EvaEriBanCen
Éditeur:
Int
Hôte:
e-Business technology adoption within the Ghanaian construction context has been described as abysmal, particularly among Ghanaian construction micro and small businesses (GCMSBs). Elucidating the salience of e-business technology in engendering construction procurement improvement, this study focuses on the development of capability within GCMSBs to engage with, and benefit from, the adoption of such technologies. The study adopts a qualitative multi-case study research design. Consequently, three (3) projects were selected based on pre-determined case selection criteria. Forty-five (45) interviewees were recruited from the projects and government agencies in a manner suggestive of purposive sampling. Excerpts from the interview sessions were transcribed and subsequently, analysed through thematic analysis. Findings confirmed that the absorptive capability of GCMSBs were indeed at a low level due to inadequate training and education, and; non-investment in capability development. A conceptual model to facilitate the adoption process in GCMSBs was proposed. These findings, as epitomized in the conceptual framework, contribute to the burgeoning discourse on the development of innovative capabilities within Micro and Small businesses in the construction industry in developing economies. Furthermore, this study highlights the positive influence of the adoption of e-business technologies on the capacity and capability of GCSMBs. Such improvements on the part of these firms through the framework will translate into optimal working relationships between them and foreign construction firms working within the local Ghanaian context. And, through such relationships, foster growth within these GCSMBs.

Visit

doi.org

Similaires

Harnessing e-procurement for green impact in construction in developing countries: a technology-organization-environment (TOE) framework and resource-based view (RBV) perspectiveUtilisation of order processing technology for logistics process improvement in the Nigerian construction industryLeveraging e-Learning technology to enhance pre-service training for healthcare trainees in Ghana: evidence from a pilot project and pointers to policy reformsLeveraging Spatial Technology for Agricultural Intensification to Address Hunger in GhanaExploring anti-corruption capabilities of e-procurement in construction project delivery in NigeriaLessening procurement deviations using procurement post reviews: evidence from Ghana

Harnessing e-procurement for green impact in construction in developing countries: a technology-organization-environment (TOE) framework and resource-based view (RBV) perspective

Purpose Given the low adoption of e-procurement and the push toward green proc

Utilisation of order processing technology for logistics process improvement in the Nigerian construction industry

The logistic technologies for effective and efficient ‘order processing operations’ in the areas of

Leveraging e-Learning technology to enhance pre-service training for healthcare trainees in Ghana: evidence from a pilot project and pointers to policy reforms

Abstract Background E-Learning solutions are increasingly being

Leveraging Spatial Technology for Agricultural Intensification to Address Hunger in Ghana

Abstract YouthMappers are using open geospatial tools in support of initiatives seeking to achieve

Exploring anti-corruption capabilities of e-procurement in construction project delivery in Nigeria

The use of electronic (e-­) procurement to support the execution of supply chain management activiti

Lessening procurement deviations using procurement post reviews: evidence from Ghana

Purpose Multilateral aid agencies generate most of their funds from taxpayers, and therefore, it i