Logo Lanfrica
  • Accueil
  • Atlas
  • Analyses
  • Documentation
  • Sign in

© 2026 Lanfrica. Tous droits réservés. Tous les droits d'auteur des ressources affichées sur le site Web Lanfrica appartiennent aux détenteurs de droits d'auteur d'origine, sauf indication contraire explicite.

Methodological Evaluation and Time-Series Forecasting for Cost-Effectiveness in Senegalese Manufacturing Systems

Domaine:

socioeconomic

Type de record:

paper
Créateur:
NDIDioSar
Éditeur:
Zenodo
Hôte:avatar

{ "background": "Manufacturing systems in West Africa face persistent challenges in achieving cost-effectiveness, with a recognised need for robust analytical frameworks to support operational decision-making. Existing evaluations often lack the integration of systematic forecasting techniques tailored to local industrial contexts.", "purpose and objectives": "This study aims to develop and validate a time-series forecasting model to measure and predict cost-effectiveness in manufacturing plants. The objective is to provide a methodological tool for evaluating system performance and informing capital allocation.", "methodology": "A longitudinal dataset of operational and financial metrics from multiple plants was analysed. The core methodological innovation is a seasonal autoregressive integrated moving average (SARIMA) model, specified as $\\phi(B)\\Phi(B^s)\\nabla^d\\nablas^D yt = \\theta(B)\\Theta(B^s)\\epsilont$, where $yt$ is the cost-effectiveness ratio. Model parameters were estimated using maximum likelihood, and forecast uncertainty was quantified with 95% prediction intervals.", "findings": "The SARIMA(1,1,1)(0,1,1)₇ model provided the best fit, with a mean absolute percentage error (MAPE) of 4.7% on the test set. A key result is that material cost volatility accounts for approximately 60% of the forecast variance in the cost-effectiveness ratio. Forecasts indicate a stable but marginal improvement in the ratio over the forecast horizon.", "conclusion": "The proposed model offers a statistically sound and operationally relevant tool for forecasting cost-effectiveness, capturing the significant influence of input cost fluctuations prevalent in the regional manufacturing environment.", "recommendations": "Plant managers should integrate this forecasting methodology into monthly operational reviews. Policymakers are advised to consider stabilising mechanisms for core material inputs to reduce systemic variance.", "key words": "cost-effectiveness, time-series analysis, SARIMA, manufacturing systems, operational forecasting, West Africa", "contribution statement": "This paper presents a novel application of SARIMA modelling for cost-effectiveness forecasting in an under

Visit

doi.org

Tags

Time-series forecastingCost-effectiveness analysisManufacturing systemsSub-Saharan AfricaOperational researchLean manufacturingProduction optimisation

Licenses

info:eu-repo/semantics/openAccessCreative Commons Attribution 4.0 Internationalhttps://creativecommons.org/licenses/by/4.0/legalcode

Similaires

Methodological Evaluation of Manufacturing Systems in Senegal Using Time-Series Forecasting for Cost-Effectiveness MeasuresMethodological Evaluation of Manufacturing Plants Systems in Ethiopia Using Time-Series Forecasting Models for Cost-Effectiveness AnalysisMethodological Evaluation and Time-Series Forecasting for Cost-Effectiveness in Kenya's Industrial Machinery FleetsA Time-Series Forecasting Model for Cost-Effectiveness Diagnostics in Ugandan Agro-Manufacturing SystemsMethodological Evaluation of Transport Maintenance Depot Systems in Nigeria Using Time-Series Forecasting Models for Cost-Effectiveness AnalysisMethodological Evaluation of Manufacturing Plants Systems in Ghana Using Time-Series Forecasting Models

Methodological Evaluation of Manufacturing Systems in Senegal Using Time-Series Forecasting for Cost-Effectiveness Measures

{ "background": "Manufacturing systems in Senegal require effective cost-effectiveness meas

Methodological Evaluation of Manufacturing Plants Systems in Ethiopia Using Time-Series Forecasting Models for Cost-Effectiveness Analysis

Manufacturing plants in Ethiopia face challenges related to operational efficiency and cost

Methodological Evaluation and Time-Series Forecasting for Cost-Effectiveness in Kenya's Industrial Machinery Fleets

{ "background": "Industrial machinery fleets represent a significant capital and operationa

A Time-Series Forecasting Model for Cost-Effectiveness Diagnostics in Ugandan Agro-Manufacturing Systems

{ "background": "Agro-manufacturing in sub-Saharan Africa faces persistent challenges in op

Methodological Evaluation of Transport Maintenance Depot Systems in Nigeria Using Time-Series Forecasting Models for Cost-Effectiveness Analysis

The efficiency of transport maintenance depots in Nigeria has been identified as a critical

Methodological Evaluation of Manufacturing Plants Systems in Ghana Using Time-Series Forecasting Models

Manufacturing plants in Ghana face challenges related to system adoption, which can impact