This paper shows the results and methodologies applied on the NRW Performance Based Contract in Dar Es Salaam (Tanzania). Studies show well-designed PBC can be 70% more effective in reducing NRW than initiatives undertaken by utilities alone. The project reduced losses in the amount of 1.2 million m3 /month and accomplished 24/7 water supply in the PBC area.