Optimized Line Amplifier Placement for Energy Saving: a Case Study of ethio telecom Optical Backbone Network

Domaine:

digital infrastructure

Type de record:

paper
Créateur:
Ase
Éditeur:
Nat
Hôte:avatar
In recent years, traffic volume is increasing tremendously. In line with this increment, telecom operators expand their network infrastructure. This increases power consumption of the network. Especially in a backbone network, where power consumption is dependent on traffic volume, the increase in power consumption is becoming critical. Researchers are made efforts dedicated to reduce unnecessary energy waste in backbone networks using physical topology optimization for highly connected networks, but this optimization is not feasible for low connected networks like ethio telecom. In addition, line amplifiers are placed at regular interval of 80km without considering physical and economic restrictions. In practice, amplifier placement is commonly implemented by operators to guarantee a signal quality considering placement location with availability supply power, shelter, and physical security with the expense of high power consumption. Current ethio telecom line amplifiers are placed at span length ranging from 25 to 120km considering these physical and economic restrictions; due to this, ethio telecom is subjected to high power consumption in line amplifiers. In this thesis, optimized line amplifier placement, which takes power consumption and physical and economic restrictions in to account is investigated. Mixed Integer Linear Programming (MILP) formulation which takes span length and input power level constraint is proposed. The proposed power-saving approach is evaluated considering ethio-telecom North circle optical backbone network topology. MATLAB is used to assign optimum placement location. The result is compared with theoretical standard (80km spacing) and the practical (ethio telecom current deployment scenario) using number of amplification sites and power saving performance. The comparison results show that amplifier site placement using the new approach can minimize the number of amplification sites by 9 from the theoretical approach and by 5 from the existing configuration and a 2% power saving can be achieved in the case study network portion.

Visit

doi.orgnadre.ethernet.edu.et

Licenses

Creative Commons Attributionhttp://www.opendefinition.org/licenses/cc-byOpen Accessinfo:eu-repo/semantics/openAccess

Similaires

Sleep Mode Operation of Optical Networks for Power Consumption Minimization: a Case Study of Ethio Telecom Backbone Optical Transport NetworkDual Band UMTS Network Energy Saving using Base Station Sleeping Mode: The Case of ethio telecomOptimized Backhaul Planning for the Case of Small Cell Deployment in Addis Ababa Region of ethio telecomApplication-Aware Data Center Network Bandwidth Utilization: the case of ethio telecomsurafelasfawosen/Ethio-Telecom-Anomaly-Detection-in-Network-TrafficRoot Cause Analysis of Mobile Site Outage Using Bayesian Network: the Case of ethio telecom

Sleep Mode Operation of Optical Networks for Power Consumption Minimization: a Case Study of Ethio Telecom Backbone Optical Transport Network

Due to the growth in data traffic volume and diversification of applications that use telecommunicat

Dual Band UMTS Network Energy Saving using Base Station Sleeping Mode: The Case of ethio telecom

Base stations represent the core contributor to the energy consumption of a mobile network. Since tr

Optimized Backhaul Planning for the Case of Small Cell Deployment in Addis Ababa Region of ethio telecom

Operators are deploying small cells to complement their macro cells to increase the coverage and cap

Application-Aware Data Center Network Bandwidth Utilization: the case of ethio telecom

The existing ethio telecom data center network (DCN) is the traditional model which provides only th

surafelasfawosen/Ethio-Telecom-Anomaly-Detection-in-Network-Traffic

An advanced, two-stage Hybrid Machine Learning architecture (Random Forest + Isolation Forest) desig

Root Cause Analysis of Mobile Site Outage Using Bayesian Network: the Case of ethio telecom

In most cellular networks Trouble Shooting (TS) is a manual process, accomplished by Radio Access Ne