Logo Lanfrica
  • Accueil
  • Atlas
  • Analyses
  • Documentation
  • Sign in

© 2026 Lanfrica. Tous droits réservés. Tous les droits d'auteur des ressources affichées sur le site Web Lanfrica appartiennent aux détenteurs de droits d'auteur d'origine, sauf indication contraire explicite.

Optimizing African Port Hinterland Connectivity Using Markov Processes, Max-Flow, and Traffic Flow Models: A Case Study of Dar es Salaam Port

Domaine:

mobilitysocioeconomic

Type de record:

paper
Créateur:
MajHon
Éditeur:
MDP
Hôte:
Dar es Salaam Port, a crucial logistical hub in East Africa, faces significant challenges related to cargo handling efficiency, road congestion, and capacity constraints. The port’s performance is pivotal for regional trade, necessitating a comprehensive analysis to identify and address operational inefficiencies. This study employed Markov processes to evaluate cargo handling and delivery times, cellular automata for simulating road traffic dynamics, and max-flow models to optimize cargo flow from the port to hinterland destinations. The analysis incorporated factors such as road and rail capacities, traffic conditions, and environmental impacts. The Markov process model indicated that cargo spends 15% of its time waiting at the port, 50% in transit, and 10% delayed, with only 25% successfully delivered. The Cellular Automata simulation revealed severe congestion for heavy trucks due to poor road conditions, with an additional 10 min delay during the rainy season. The max-flow model highlighted that while the road and rail networks generally meet demand, significant bottlenecks exist, particularly for Lubumbashi, which faces a capacity shortfall of 500 t/day. The findings offer actionable insights for stakeholders. Logistics operators can leverage the framework to predict delays, optimize resource allocation, and improve delivery reliability. Policymakers can prioritize strategic investments in infrastructure upgrades, traffic management, and road maintenance to reduce delays and congestion. Scholars can adopt the integrated methodology to analyze similar systems. Together, these efforts can enhance Dar es Salaam Port’s operational efficiency, reduce transit times, and support regional trade development..

Visit

doi.org

Licenses

https://creativecommons.org/licenses/by/4.0/

Similaires

Optimizing Urban Traffic Congestion Through Artificial Intelligence and Machine Learning: A Case Study of Dar Es Salaam CityContextual Comparative Analysis of Dar es Salaam and Mombasa Port Performance by Using a Hybrid DEA(CVA) ModelA topolographical approach to infrastructure : Political topography, topology and the port of Dar es SalaamThe role of information systems usage in enhancing port logistics performance: evidence from the Dar Es Salaam port, TanzaniaOptimising maritime logistics to island ports using Max-Flow and Traffic modellingThe Integration Of 5MW Solar Power Into Port Harcourt Town Using Unified Power Flow Controller

Optimizing Urban Traffic Congestion Through Artificial Intelligence and Machine Learning: A Case Study of Dar Es Salaam City

Urban traffic congestion remains a defining obstacle to efficient mobility and infrastructure use in

Contextual Comparative Analysis of Dar es Salaam and Mombasa Port Performance by Using a Hybrid DEA(CVA) Model

Background: This research conducts a contextual comparative analysis between Dar es Salaam and Momba

A topolographical approach to infrastructure : Political topography, topology and the port of Dar es Salaam

Economic infrastructure hubs, such as ports, are crucial sites for exploring new political geographi

The role of information systems usage in enhancing port logistics performance: evidence from the Dar Es Salaam port, Tanzania

Optimising maritime logistics to island ports using Max-Flow and Traffic modelling

Efficient maritime logistics between mainland ports and island destinations is essential for trade a

The Integration Of 5MW Solar Power Into Port Harcourt Town Using Unified Power Flow Controller

This study investigates the integration of a 5MW solar power system into the Elekahia Housing Estate