Postaward Contract Administration in an EPC Hydropower Project: Key Challenges, Disputes, and Lessons Learned

Créateur:
HarMohFarMuz
Éditeur:
Ame
Hôte:
Abstract The use of the design-build (DB) and/or engineering, procurement, construction (EPC) project delivery method is rapidly increasing in the public sector. Whereas DB/EPC has been widely and successfully used to deliver infrastructure projects mainly in the United States and Asia, its application in sub-Saharan Africa remains underdocumented, with numerous challenges still to be addressed. One significant challenge is the effective administration of contracts during the construction phase. To bridge this knowledge gap, this paper presents a case study of a hydropower project in Uganda delivered using the EPC method. It explores key challenges and lessons learned from the owner’s perspective during the postaward construction contract administration (PACCA) phase. The study methodology consisted of performing a literature review, analysis of project documentation, site visits, direct observation during meetings, and semistructured interviews with key personnel from the owner’s project team and industry experts. EPC contract administration challenges were examined under seven categories. The key challenges were found to include the owner’s limited experience with the delivery method, inadequate site supervision, change orders’ mismanagement, incomplete and ambiguous performance criteria, poor documentation and record management, and premature issuance of the certificate for substantial completion. The lessons learned aim to enhance PACCA practices in developing countries, particularly for public agencies in sub-Saharan Africa working with international contractors on EPC projects.

Visit

doi.org

Similaires

Challenges Of Project Procurement And Contract Administration: The Case Of Optimal Traffic Routing Automation Project, Ethio TelecomChallenges and Lessons Learned from Counter Terrorism Strategies in KenyaKey lessons learned from the immunization supply chain of Malawi, an African country using EVM2.0Nodding syndrome research, lessons learned from the NSETHIO projectContact Tracing and the COVID-19 Response in Africa: Best Practices, Key Challenges, and Lessons Learned from Nigeria, Rwanda, South Africa, and UgandaDesign and Construction of Tunnels in Ethiopia: Lessons Learned from the Case of Gilgel Gibe III Hydropower Tunnels

Challenges Of Project Procurement And Contract Administration: The Case Of Optimal Traffic Routing Automation Project, Ethio Telecom

The purpose of this study is to examine how scope/specification development and involvement of conce

Challenges and Lessons Learned from Counter Terrorism Strategies in Kenya

The changing nature of terrorism activities both in the developed and developing countries makes it

Key lessons learned from the immunization supply chain of Malawi, an African country using EVM2.0

Nodding syndrome research, lessons learned from the NSETHIO project

Background. Until recently, nodding syndrome (NS) was considered as a mysterious disease of unknown

Contact Tracing and the COVID-19 Response in Africa: Best Practices, Key Challenges, and Lessons Learned from Nigeria, Rwanda, South Africa, and Uganda

ABSTRACT Most African countries have recorded relatively lower COVID-19 burdens than Western countr

Design and Construction of Tunnels in Ethiopia: Lessons Learned from the Case of Gilgel Gibe III Hydropower Tunnels

Tunnels are long linear undertakings with few opportunities to perform the work at more than one loc