Logo Lanfrica
  • Accueil
  • Atlas
  • Analyses
  • Documentation
  • Sign in

© 2026 Lanfrica. Tous droits réservés. Tous les droits d'auteur des ressources affichées sur le site Web Lanfrica appartiennent aux détenteurs de droits d'auteur d'origine, sauf indication contraire explicite.

Production Scheduling of Open Pit Mine Using Sequential Branch-and-Cut and Longest Path Algorithm: An Application from an African Copper Mine

Type de record:

paper
Créateur:
DevSus
Éditeur:
Int
Hôte:
Open pit mine production scheduling assigns mining blocks in different production periods for maximising profits after satisfying geotechnical and operational constraints. In this paper, two Open pit mine production scheduling models were applied in an African copper deposit. The first model is a traditional model with more tight resource constraints; the second model is a more robust model where resource constraints are relaxed by penalizing the objective function. Both the models were solved using two step algorithms: (a) year wise production scheduling using a sequential branch-and-cut algorithm; and (b) an iterative longest path algorithm to improve the solution generated from branch-and-cut. Results demonstrated that due to the tight constraints in Model 1, the optimizer was unable to generate a feasible solution after the first period, therefore the lower limit metal production constraint was eliminated to generate a feasible solution; however, Model 2 was able to generate a feasible solution for all periods. Results show that both the models generated nearly the same amount of ore, waste, metal content, and mine life. Model 2 generates relatively more net present value as compared to Model 1, whereas, the computational time required for solving the scheduling problem is relatively less for Model 1 than for Model 2.

Visit

doi.org

Licenses

http://iieta.org/sites/default/files/TEXT%20AND%20DATA%20MINING%20SERVICE%20AGREEMENT.pdf

Similaires

mulengachilufya/open-pit-mine-slope-instability-innovationOptimum Open Pit Design for Kenticha Tantalite Mine, Southern EthiopiaAssessing the Importance of Air-Decking Blasting in Controlling BIGV at an Open Pit Gold Mine in Tanzania using ANN ModelChanging control and accounting in an African gold mineNew approach to flexible open pit optimisation and schedulingA Solution Surface in a Nine-Dimensional Space to Optimise the Effects of Ground Vibration Through Artificial Intelligence During Blasting in an Open-Pit Mine

mulengachilufya/open-pit-mine-slope-instability-innovation

Innovation designed to monitor slope instability for open-pit mines in Zambia # MineShield — Open-P

Optimum Open Pit Design for Kenticha Tantalite Mine, Southern Ethiopia

The mining sector’s share in Ethiopia’s economy is gradually increasing. Among metallic mines, Legad

Assessing the Importance of Air-Decking Blasting in Controlling BIGV at an Open Pit Gold Mine in Tanzania using ANN Model

Air-decking blasting technique is used to control blast induced ground vibration (BIGV) in several m

Changing control and accounting in an African gold mine

Purpose The paper aims to examine accounting changes in the Ashanti Gold Corporation (AGC) in Ghan

New approach to flexible open pit optimisation and scheduling

International audience This paper proposes a dynamic procedure for pit optimisation a

A Solution Surface in a Nine-Dimensional Space to Optimise the Effects of Ground Vibration Through Artificial Intelligence During Blasting in an Open-Pit Mine

In this study, we model a solution surface with each point having nine components using artificial i