Logo Lanfrica
  • Accueil
  • Atlas
  • Analyses
  • Documentation
  • Sign in

© 2026 Lanfrica. Tous droits réservés. Tous les droits d'auteur des ressources affichées sur le site Web Lanfrica appartiennent aux détenteurs de droits d'auteur d'origine, sauf indication contraire explicite.

Real-Time Reservoir Management in a High-Cost Deepwater Environment - Greater Plutonio

Type de record:

paper
Créateur:
Den
Éditeur:
Soc
Hôte:
This article, written by Senior Technology Editor Dennis Denney, contains highlights of paper SPE 128542, ’Greater Plutonio - Real-Time Reservoir Man age - ment in a High-Cost Deepwater En vironment,’ by Dave Booth, SPE, and Pedro Sebastiao, SPE, BP plc, prepared for the 2010 SPE Intelligent Energy Conference and Exhibition, Utrecht, The Netherlands, 23-25 March. The paper has not been peer reviewed. Greater Plutonio is a large subsea development with a planned first phase of 43 high-rate subsea wells. A relatively low level of classical field appraisal was performed because of high costs. Innovative subsurface management was required to reduce substantial uncertainty during the development phase. Remote access to real-time data enabled making better decisions faster and reducing the number of field staff.   Introduction The Greater Plutonio fields (Plutonio, Cobalto, Galio, Cromio, and Paladio) were discovered offshore Angola between 1999 and 2000 and are Upper Oligocene turbidite reservoirs. Changes in fluid and lithology in the semiconsolidated reservoir rocks manifest themselves as distinct changes in seismic response. Water depths are between 1200 and 1400 m, and a relatively dispersed resource base resulted in the most viable development concept being a 100% subsea-well development with multikilometer-scale well spacing produced through a large floating production, storage, and offloading (FPSO) vessel. The initial development phase of 43 wells, plus up to 25 additional infill and sidetrack wells, was the largest subsea development undertaken by the operator. Of the initial 43 wells, 23 are injection wells, and most are completed across multiple reservoirs with full sand control. At the time of writing this paper, 34 wells had been drilled, and subsurface outcome was largely as expected. All reservoirs are waterflooded, with approximately one-half the injection wells having downhole flow control (DHFC) to improve injection management. The high-porosity rocks often have permeability exceeding 1 darcy, which, combined with high-gravity oil, provide a favorable mobility ratio and very efficient displacement. Recovery factors in some reservoirs should exceed 50%. The associated gas is injected through two wells in the Plutonio field to provide pressure support. This process will continue for 3 to 4 years after field startup, until gas export is available after commissioning of the Angola liquefied-natural-gas project. All of the production wells have openhole-gravel-pack (OHGP) completions, some with openhole completion lengths of up to 800 m. Although confidence to sanction the project was provided by the high-quality seismic data, a high degree of subsurface uncertainty remained (e.g., reservoir connectivity). Appraisal drilling was conducted in only one of the five fields. Therefore, a significant amount of subsurface appraisal was loaded into the development stage. The understanding and management of subsurface uncertainty has been crucial for the development, with early and effective data collection by use of wireline, logging-while-drilling (LWD), and coring programs; preproduction well-interference testing; and real-time data acquisition during the ramp-up period.

Visit

doi.org

Similaires

A Low-Cost Distributed IoT Sensor Network for Real-Time Air Quality Management: A Case Study at Federal Polytechnic Oko, NigeriaOptimizing Real-Time Scheduling for Post Islanding Energy Management Using African Vulture Optimization Algorithm on Hybrid Microgrids EnvironmentNovel Application of QuantiMin SQP Methodology for Improved Reservoir Characterization in a Deepwater Turbidite Field DevelopmentCost Effective Dry Tree Field Development in Deepwater West AfricaDevelopment of a Low-Cost GSM-based Smart Energy Meter for real-time NotificationsInnovative Process for Formation Damage Removal in Sandstone Reservoir Based on Real-Time Downhole Monitoring: A Malaysia Case History

A Low-Cost Distributed IoT Sensor Network for Real-Time Air Quality Management: A Case Study at Federal Polytechnic Oko, Nigeria

This study presents the design and deployment of a low-cost, distributed IoT sensor network for real

Optimizing Real-Time Scheduling for Post Islanding Energy Management Using African Vulture Optimization Algorithm on Hybrid Microgrids Environment

Microgrids (MG) are small-scale energy systems that use distributed energy storage and sources. Hybr

Novel Application of QuantiMin SQP Methodology for Improved Reservoir Characterization in a Deepwater Turbidite Field Development

Abstract The success of any green as well as mature field development planning and

Cost Effective Dry Tree Field Development in Deepwater West Africa

Abstract An innovative, low cost, deepwater development concept has been devised

Development of a Low-Cost GSM-based Smart Energy Meter for real-time Notifications

Abstract 
To bridge the metering gap in Nigeria,

Innovative Process for Formation Damage Removal in Sandstone Reservoir Based on Real-Time Downhole Monitoring: A Malaysia Case History

Abstract Many retrograde condensate gas wells in field A, located offshore Malaysia