Logo Lanfrica
  • Accueil
  • Atlas
  • Analyses
  • Documentation
  • Sign in

© 2026 Lanfrica. Tous droits réservés. Tous les droits d'auteur des ressources affichées sur le site Web Lanfrica appartiennent aux détenteurs de droits d'auteur d'origine, sauf indication contraire explicite.

RISK-BASED PREDICTIVE MODELLING FOR HIGHWAY PROJECT DURATIONS IN NIGERIA USING MULTIPLE LINEAR REGRESSION AND ARTIFICIAL NEURAL NETWORK

Domaine:

socioeconomicmobility

Type de record:

paper
Créateur:
VicMuzAyo
Éditeur:
Glo
Hôte:
Across the globe, highway infrastructure plays a pivotal role in national development by supporting the movement of people, goods, and services, making the timely delivery of such projects essential for economic growth and public welfare. Highway infrastructure projects attract huge budgetary allocations; hence, their timely completion is of significant importance. In Nigeria, schedule overruns on highway projects remain a persistent challenge, and previous studies on forecasting highway project duration relied mainly on conventional methods, which have yielded limited accuracy. This study presents a more robust approach to predicting highway construction durations by integrating both contemporary and traditional modelling techniques “Artificial Neural Networks (ANN) and Multiple Linear Regression (MLR).” A dataset comprising 103 completed federal highway projects executed between 2002 and 2022 was compiled using a snowball sampling strategy, drawing from the 2017 Federal Ministry of Works and Housing publication as well as additional inputs from highway engineers and quantity surveyors across Nigeria. For each project, a key professional was selected using the purposive sampling method to solicit detailed information on schedule-related risk factors via a structured questionnaire. These identified risks, combined with historical schedule data for each identified project, were employed as predictor variables for developing the schedule estimation models. Comparative analysis of model performance indicated that the ANN technique produced significantly more accurate duration forecasts than the MLR model. The study contributes to a practical and data-driven predictive tool that can assist government agencies, consulting firms, and contractors in enhancing the reliability of schedule planning and mitigating delays in future highway infrastructure delivery

Visit

doi.org

Similaires

Modelling Cost-Risk Impact on Nigerian Highway Projects Using Multiple Linear Regression and Artificial Neural NetworksSkill Comparison of Multiple-Linear Regression Model and Artificial Neural Network Model in Seasonal Rainfall Prediction-North East NigeriaQuantification of contamination, ecological risk index, and health risk assessment of groundwater using artificial neural network and multi-linear regression modeling approaches within Egbema, NigeriaComparison of Multiple Linear Regression and Artificial Neural Network Models in retrieving Water Quality Parameters using Remotely Sensed Data: Lake Victoria (Tanzanian) WaterApplication of Artificial Neural Network and Multi-linear Regression Techniques in Groundwater Quality and Health Risk Assessment around Egbema, Southeastern NigeriaGlobal Solar Radiation Modelling using an Artificial Neural Network for Kazaure, Jigawa State, Nigeria

Modelling Cost-Risk Impact on Nigerian Highway Projects Using Multiple Linear Regression and Artificial Neural Networks

Cost predictive models for highway projects are relatively scarce in developing countries, despite t

Skill Comparison of Multiple-Linear Regression Model and Artificial Neural Network Model in Seasonal Rainfall Prediction-North East Nigeria

International audience Seasonal Rainfall in Nigeria is usually complex due to the tre

Quantification of contamination, ecological risk index, and health risk assessment of groundwater using artificial neural network and multi-linear regression modeling approaches within Egbema, Nigeria

Comparison of Multiple Linear Regression and Artificial Neural Network Models in retrieving Water Quality Parameters using Remotely Sensed Data: Lake Victoria (Tanzanian) Water

Water is an essential resource for the survival and well-being of humans and ecosystems; hence, the

Application of Artificial Neural Network and Multi-linear Regression Techniques in Groundwater Quality and Health Risk Assessment around Egbema, Southeastern Nigeria

Abstract This paper examined the efficiency of artificial neural network (ANN) and multiva

Global Solar Radiation Modelling using an Artificial Neural Network for Kazaure, Jigawa State, Nigeria

This research presents an algorithm based on Artificial Neural Networks (ANN), for estimating monthl