Logo Lanfrica
  • Accueil
  • Atlas
  • Analyses
  • Documentation
  • Sign in

© 2026 Lanfrica. Tous droits réservés. Tous les droits d'auteur des ressources affichées sur le site Web Lanfrica appartiennent aux détenteurs de droits d'auteur d'origine, sauf indication contraire explicite.

TIME Impact â a new user-friendly tuberculosis (TB) model to inform TB policy decisions

Domaine:

healthcare

Type de record:

software
Créateur:
R. M. T. M.
Éditeur:
fig
Hôte:avatar
Abstract Tuberculosis (TB) is the leading cause of death from infectious disease worldwide, predominantly affecting low- and middle-income countries (LMICs), where resources are limited. As such, countries need to be able to choose the most efficient interventions for their respective setting. Mathematical models can be valuable tools to inform rational policy decisions and improve resource allocation, but are often unavailable or inaccessible for LMICs, particularly in TB. We developed TIME Impact, a user-friendly TB model that enables local capacity building and strengthens country-specific policy discussions to inform support funding applications at the (sub-)national level (e.g. Ministry of Finance) or to international donors (e.g. the Global Fund to Fight AIDS, Tuberculosis and Malaria). TIME Impact is an epidemiological transmission model nested in TIME, a set of TB modelling tools available for free download within the widely-used Spectrum software. The TIME Impact model reflects key aspects of the natural history of TB, with additional structure for HIV/ART, drug resistance, treatment history and age. TIME Impact enables national TB programmes (NTPs) and other TB policymakers to better understand their own TB epidemic, plan their response, apply for funding and evaluate the implementation of the response. The explicit aim of TIME Impactâ s user-friendly interface is to enable training of local and international TB experts towards independent use. During application of TIME Impact, close involvement of the NTPs and other local partners also builds critical understanding of the modelling methods, assumptions and limitations inherent to modelling. This is essential to generate broad country-level ownership of the modelling data inputs and results. In turn, it stimulates discussions and a review of the current evidence and assumptions, strengthening the decision-making process in general. TIME Impact has been effectively applied in a variety of settings. In South Africa, it informed the first South African HIV and TB Investment Cases and successfully leveraged additional resources from the National Treasury at a time of austerity. In Ghana, a long-term TIME model-centred interaction with the NTP provided new insights into the local epidemiology and guided resource allocation decisions to improve impact.

Visit

doi.orgfigshare.com

Tags

MedicineBiotechnology69999 Biological Sciences not elsewhere classifiedFOS: Biological sciences80699 Information Systems not elsewhere classifiedFOS: Computer and information sciencesCancerStatisticsFOS: MathematicsScience Policy+2

Licenses

CC BY 4.0https://creativecommons.org/licenses/by/4.0

Similaires

TIME Impact – a new user-friendly tuberculosis (TB) model to inform TB policy decisions تايم إمباكت – نموذج جديد سهل الاستخدام للسل (TB) لإبلاغ قرارات سياسة السل Impact TEMPOREL – un nouveau modèle de tuberculose (TB) convivial pour éclairer les décisions politiques en matière de tuberculose TIME Impact: un nuevo modelo de tuberculosis (TB) fácil de usar para informar las decisiones políticas sobre la TB

TIME Impact – a new user-friendly tuberculosis (TB) model to inform TB policy decisions تايم إمباكت – نموذج جديد سهل الاستخدام للسل (TB) لإبلاغ قرارات سياسة السل Impact TEMPOREL – un nouveau modèle de tuberculose (TB) convivial pour éclairer les décisions politiques en matière de tuberculose TIME Impact: un nuevo modelo de tuberculosis (TB) fácil de usar para informar las decisiones políticas sobre la TB

Tuberculosis (TB) is the leading cause of death from infectious disease worldwide, predominantly aff