Logo Lanfrica
  • Home
  • Atlas
  • Insights
  • Docs
  • Sign in

© 2026 Lanfrica. All rights reserved. All copyrights of the resources shown on the Lanfrica website belong to the original copyright holders, unless explicitly stated otherwise.

Artificially Code-Switched Training Data Volume and Zero-Shot MIRACL Retrieval Accuracy Across Language Resource Levels

Domain:

natural language processing
Creator:
Ass
Publisher:
Zenodo
Host:avatar
Transferring information retrieval (IR) models from a high-resource language (typically English) to other languages in a zero-shot fashion has become a widely adopted approach. In this work, we show that the effectiveness of zero-shot rankers diminishes when queries and documents are present in different languages. Motivated by this, we propose to train ranking models on artificially code-switched data instead, which we generate by utilizing bilingual lexicons. To this end, we experiment with lexicons induced from (1) cross-lingual word embeddings and (2) parallel Wikipedia page titles. We use Research goal: How does the volume of artificially code-switched training data impact zero-shot retrieval accuracy on the MIRACL benchmark for low-resource languages compared to high-resource languages? Autonomous synthesis report generated by Assignee Research. Tribunal consensus score: 8.1/10. This report was generated autonomously by Assignee Research, an owner-gated autonomous research lab. The content synthesizes findings from peer-reviewed papers. Tribunal score: 8.1/10.

Visit

doi.orgzenodo.org

Tasks

information retrieval

Tags

volumeartificiallycode-switchedtrainingdataimpactzero-shotretrieval

Licenses

Creative Commons Attribution 4.0 Internationalhttps://creativecommons.org/licenses/by/4.0/legalcode

Similar

Impact of Artificially Code-Switched Training Data Volume on Zero-Shot Retrieval for Low-Resource Languages in MIRACLPerformance of Artificially Code-Switched Models in Zero-Shot Cross-Lingual Retrieval Across Resource LevelsScaling Bilingual Lexicons for Zero-Shot Cross-Lingual Retrieval on Artificially Code-Switched Low-Resource Data in MIRACLScaling Artificially Code-Switched Training Data for Zero-Shot Multilingual Dense Retrieval in Low-Resource LanguagesArtificially Code-Switched Training for Zero-Shot Cross-Lingual Retrieval in Low-Resource LanguagesPerformance of Zero-Shot Cross-Lingual Retrieval Models with Artificially Code-Switched Training Data

Impact of Artificially Code-Switched Training Data Volume on Zero-Shot Retrieval for Low-Resource Languages in MIRACL

Transferring information retrieval (IR) models from a high-resource language (typically English) to

Performance of Artificially Code-Switched Models in Zero-Shot Cross-Lingual Retrieval Across Resource Levels

Transferring information retrieval (IR) models from a high-resource language (typically English) to

Scaling Bilingual Lexicons for Zero-Shot Cross-Lingual Retrieval on Artificially Code-Switched Low-Resource Data in MIRACL

Transferring information retrieval (IR) models from a high-resource language (typically English) to

Scaling Artificially Code-Switched Training Data for Zero-Shot Multilingual Dense Retrieval in Low-Resource Languages

Transferring information retrieval (IR) models from a high-resource language (typically English) to

Artificially Code-Switched Training for Zero-Shot Cross-Lingual Retrieval in Low-Resource Languages

Transferring information retrieval (IR) models from a high-resource language (typically English) to

Performance of Zero-Shot Cross-Lingual Retrieval Models with Artificially Code-Switched Training Data

Transferring information retrieval (IR) models from a high-resource language (typically English) to