Logo Lanfrica
  • Home
  • Atlas
  • Insights
  • Docs
  • Sign in

© 2026 Lanfrica. All rights reserved. All copyrights of the resources shown on the Lanfrica website belong to the original copyright holders, unless explicitly stated otherwise.

Performance of Artificially Code-Switched Models in Zero-Shot Cross-Lingual Retrieval Across Resource Levels

Domain:

natural language processing

Record type:

paper
Creator:
Ass
Publisher:
Zenodo
Host:avatar
Transferring information retrieval (IR) models from a high-resource language (typically English) to other languages in a zero-shot fashion has become a widely adopted approach. In this work, we show that the effectiveness of zero-shot rankers diminishes when queries and documents are present in different languages. Motivated by this, we propose to train ranking models on artificially code-switched data instead, which we generate by utilizing bilingual lexicons. To this end, we experiment with lexicons induced from (1) cross-lingual word embeddings and (2) parallel Wikipedia page titles. We use Research goal: How do models trained on artificially code-switched data perform in zero-shot cross-lingual retrieval tasks when evaluated on low-resource language pairs compared to high-resource language pairs? Autonomous synthesis report generated by Assignee Research. Tribunal consensus score: 8.5/10. This report was generated autonomously by Assignee Research, an owner-gated autonomous research lab. The content synthesizes findings from peer-reviewed papers. Tribunal score: 8.5/10.

Visit

doi.orgzenodo.org

Tasks

information retrievalcode switching

Tags

modelstrainedartificiallycode-switcheddataperformzero-shotcross-lingual

Licenses

Creative Commons Attribution 4.0 Internationalhttps://creativecommons.org/licenses/by/4.0/legalcode

Similar

Performance of Zero-Shot Cross-Lingual Retrieval Models with Artificially Code-Switched Training DataArtificially Code-Switched Training for Zero-Shot Cross-Lingual Retrieval in Low-Resource LanguagesPerformance of Zero-Shot Cross-Lingual Retrieval Models on Artificially Code-Switched Data vs. Multilingual Datasets inCross-Lingual Embeddings for Zero-Shot Retrieval on Artificially Code-Switched Low-Resource DataScaling Behavior of Zero-Shot Cross-Lingual Retrieval on Artificially Code-Switched Versus Native Data Across Low-ResourceArtificially Code-Switched Training Data Volume and Zero-Shot MIRACL Retrieval Accuracy Across Language Resource Levels

Performance of Zero-Shot Cross-Lingual Retrieval Models with Artificially Code-Switched Training Data

Transferring information retrieval (IR) models from a high-resource language (typically English) to

Artificially Code-Switched Training for Zero-Shot Cross-Lingual Retrieval in Low-Resource Languages

Transferring information retrieval (IR) models from a high-resource language (typically English) to

Performance of Zero-Shot Cross-Lingual Retrieval Models on Artificially Code-Switched Data vs. Multilingual Datasets in

Benefiting from transformer-based pre-trained language models, neural ranking models have made signi

Cross-Lingual Embeddings for Zero-Shot Retrieval on Artificially Code-Switched Low-Resource Data

Transferring information retrieval (IR) models from a high-resource language (typically English) to

Scaling Behavior of Zero-Shot Cross-Lingual Retrieval on Artificially Code-Switched Versus Native Data Across Low-Resource

Transferring information retrieval (IR) models from a high-resource language (typically English) to

Artificially Code-Switched Training Data Volume and Zero-Shot MIRACL Retrieval Accuracy Across Language Resource Levels

Transferring information retrieval (IR) models from a high-resource language (typically English) to