Significant Factors Causing Delay of Ethiopian Road Construction Projects performing by Foreign General Contactors

Record type:

paper
Creator:
DirMohBinDir
Publisher:
Pen
Host:
Following the booming of the Ethiopian construction industry, a number of Foreign General Contractors (FGCs) are participating in the industry. The severity of the construction projects schedule delay, which is a worldwide problem also, affecting the FGCs participating in the Ethiopian road construction projects. Identifying the challenging factors affect the project performance was an important and initial stage for improving the project progress. This study identified the significant factors that cause the projects schedule delay systematically and objectively. After 30 factors were determined from literature and pilot survey, the final questionnaire survey of 235 domain experts was conducted to systematically select 20 factors. Based on the 20 selected factors, 81 historical data of road construction projects with schedule delay were collected; and the database was established. The artificial neural network (ANN) inference model was developed to train the database and predict the project schedule delay. Integrating it with the Garson algorithm (GA), the relative weights of challenging factors with rankings were calculated and identified. The top ten significant factors identified were Contractor's poor site management; Ineffective planning, scheduling, controlling and quality monitoring; Difficulty in Budget availability for the project; Delays in construction activities due to weather changes; late land acquisition; Shortage of materials; Financial problem of contractors; Poor supervision; Cash-flow problems (irregular payments), and Financial Capability of Client. This study uses as a significant reference for FGCs who are currently working in the Ethiopian Road construction projects for improving the projects schedule performance.

Visit

doi.org

Languages

Amharic

Similar

Success factors for implementing Uganda’s public road construction projectsDelay Factors and Time-Cost Performance of Construction Projects in Gaborone City Council, BotswanaConstruction Schedule Risk Assessment and Management Strategy for Foreign General Contractors Working in the Ethiopian Construction IndustryModeling Delay Percentage of Construction Projects in Egypt Using Statistical-Fuzzy ApproachDelay Management as a Mitigation Strategy for Conflicts in Construction Projects in KenyaCauses and Effects of Delay in Ethiopia’s Public Construction Projects: A Structural Equation Modeling Approach

Success factors for implementing Uganda’s public road construction projects

The construction industry is known for its underperformance. Globally, construction projects are oft

Delay Factors and Time-Cost Performance of Construction Projects in Gaborone City Council, Botswana

The problem of delays in the construction industry is a global phenomenon and the construction indus

Construction Schedule Risk Assessment and Management Strategy for Foreign General Contractors Working in the Ethiopian Construction Industry

Construction project schedule delay is a worldwide concern and especially severe in the Ethiopian co

Modeling Delay Percentage of Construction Projects in Egypt Using Statistical-Fuzzy Approach

Delay Management as a Mitigation Strategy for Conflicts in Construction Projects in Kenya

The problem of conflicts in construction projects is a fact that happens in many countries, one of w

Causes and Effects of Delay in Ethiopia’s Public Construction Projects: A Structural Equation Modeling Approach

The construction industry plays a great role in the development of any country by transforming the a