Logo Lanfrica
  • Accueil
  • Atlas
  • Analyses
  • Documentation
  • Sign in

© 2026 Lanfrica. Tous droits réservés. Tous les droits d'auteur des ressources affichées sur le site Web Lanfrica appartiennent aux détenteurs de droits d'auteur d'origine, sauf indication contraire explicite.

Comparative Methodological Evaluation and Time-Series Forecasting for Cost-Effectiveness in Rwanda's Power-Distribution Infrastructure (2000–2026)

Domaine:

environment and energy
Créateur:
MukUwiUwaNku
Éditeur:
Zenodo
Hôte:avatar

{ "background": "Power-distribution infrastructure in developing nations requires robust, cost-effective planning methodologies. Existing approaches often lack integrated, long-term forecasting models tailored to specific regional constraints and equipment lifecycles.", "purpose and objectives": "This study conducts a comparative methodological evaluation of equipment systems and develops a bespoke time-series forecasting model to measure and project cost-effectiveness for national power-distribution infrastructure.", "methodology": "A comparative analysis of transformer and switchgear systems was performed using historical operational and cost data. A seasonal autoregressive integrated moving average (SARIMA) model, specified as $\\phi(B)\\Phi(B^s)\\nabla^d\\nabla^Ds yt = \\theta(B)\\Theta(B^s)\\epsilon_t$, was developed for forecasting. Model diagnostics included analysis of robust standard errors to account for heteroskedasticity.", "findings": "The forecasting model indicates a projected 22% reduction in total lifecycle costs per kilometre of network for the recommended equipment portfolio over a 25-year period. Comparative analysis identified specific switchgear technologies as having superior long-term cost-performance ratios under local operational conditions.", "conclusion": The integrated methodological framework provides a more reliable tool for long-term infrastructure investment planning than previous static models, demonstrating significant potential for cost optimisation.", "recommendations": "Infrastructure planners should adopt the developed forecasting model for capital investment appraisals. A phased transition towards the identified high-performance equipment portfolio is recommended to maximise future cost savings.", "key words": "infrastructure planning, lifecycle costing, SARIMA modelling, power distribution, cost-effectiveness, forecasting", "contribution statement": "This paper presents a novel integrated methodology combining comparative equipment evaluation with a bespoke time-series forecasting model, providing a new decision-support tool for engineering economists and infrastructure planners." } ``` Background Power-distribution infrastructure in developing nations requires robust, cost-effective planning methodologies. Existing approaches often lack integrated, long-term forecasting models tailored to specific regional constraints and equipment lifecycles. Purpose and objectives This study conducts a

Visit

doi.org

Tags

Power-distribution infrastructureTime-series forecastingCost-effectiveness analysisSub-Saharan AfricaComparative methodologyEngineering economics

Licenses

info:eu-repo/semantics/openAccessCreative Commons Attribution 4.0 Internationalhttps://creativecommons.org/licenses/by/4.0/legalcode

Similaires

A Time-Series Forecasting Model for Risk Reduction in Rwanda's Power-Distribution Infrastructure: A Policy Analysis, 2000–2026A Time-Series Forecasting Model for the Cost-Effectiveness of South African Municipal Infrastructure Asset Systems: A Methodological Evaluation (2000–2026)Methodological Evaluation and Time-Series Forecasting for Cost-Effectiveness in Senegalese Manufacturing SystemsTime-Series Forecasting Model Evaluation for Cost-Effectiveness of Power-Distribution Equipment Systems in South AfricaMethodological Evaluation and Time-Series Forecasting for Industrial Machinery Fleet Reliability in Ethiopia (2000–2026)Methodological Evaluation and Time-Series Forecasting for Manufacturing Plant Efficiency Gains in Ethiopia (2000–2026)

A Time-Series Forecasting Model for Risk Reduction in Rwanda's Power-Distribution Infrastructure: A Policy Analysis, 2000–2026

{ "background": "Rwanda's power-distribution infrastructure faces significant reliability c

A Time-Series Forecasting Model for the Cost-Effectiveness of South African Municipal Infrastructure Asset Systems: A Methodological Evaluation (2000–2026)

{ "background": "Municipal infrastructure asset systems in South Africa face significant ch

Methodological Evaluation and Time-Series Forecasting for Cost-Effectiveness in Senegalese Manufacturing Systems

{ "background": "Manufacturing systems in West Africa face persistent challenges in achievi

Time-Series Forecasting Model Evaluation for Cost-Effectiveness of Power-Distribution Equipment Systems in South Africa

The field of engineering in South Africa has identified a need to evaluate the cost-effecti

Methodological Evaluation and Time-Series Forecasting for Industrial Machinery Fleet Reliability in Ethiopia (2000–2026)

Industrial machinery fleets in developing economies face unique reliability challenges due

Methodological Evaluation and Time-Series Forecasting for Manufacturing Plant Efficiency Gains in Ethiopia (2000–2026)

The systematic measurement of efficiency gains in industrial settings is critical for susta