Machine Learning-Based Prediction of Construction Project Delays in Public Building Projects in Nigeria

Domaine:

socioeconomic

Type de record:

paper
Créateur:
Iss
Éditeur:
Iss
Éditeur:
Zenodo
Hôte:avatar
Construction project delays remain one of the major challenges affecting the successful delivery of public infrastructure in Nigeria, resulting in significant cost overruns, schedule extensions, and reduced project performance. This study developed and evaluated a machine learning framework for predicting delays in public building projects using historical project data from 1,200 completed projects executed between 2015 and 2022. Twenty-three project characteristics, including contract sum, project duration, payment delay, material price increase, contractor experience, project complexity, and design modifications, were used as predictor variables. The dataset was preprocessed through missing value imputation, outlier treatment, feature engineering, and standardization before model development. Six supervised machine learning algorithms comprising Logistic Regression, Decision Tree, Random Forest, Support Vector Machine, Artificial Neural Network, and Extreme Gradient Boosting (XGBoost) were trained and evaluated using five-fold cross-validation. Results showed that 67.2% of the projects experienced schedule delays, with an average delay duration of 182.4 days. Correlation and feature importance analyses identified payment delay, project complexity, and material price escalation as the most influential predictors of project delay.Comparative evaluation indicated that the XGBoost model achieved the highest predictive performance with an accuracy of 96.67%, precision of 96.34%, recall of 96.08%, F1-score of 96.21%, and ROC-AUC of 0.989, outperforming the Artificial Neural Network (95.42%), Random Forest (93.75%), Support Vector Machine (91.25%), Decision Tree (87.08%), and Logistic Regression (84.58%). The optimized model correctly classified 232 out of 240 testing observations and demonstrated excellent robustness with a cross-validation standard deviation of only 0.34%. The developed framework provides an interpretable and highly reliable decision-support tool capable of identifying high risk projects before significant schedule overruns occur, thereby supporting proactive project management, efficient resource allocation, and improved delivery of public building projects in Nigeria.

Visit

doi.org

Tags

Machine learningConstruction delaysPublic building projectsXGBoostProject risk prediction

Licenses

Creative Commons Attribution 4.0 Internationalhttps://creativecommons.org/licenses/by/4.0/legalcode

Similaires

A computer-based cost prediction model for institutional building projects in NigeriaDistribution Prediction of Strategic Flight Delays via Machine Learning MethodsMaterial waste minimization techniques in building construction projectsMachine learning-based model for prediction of accountants behaviour in NigeriaASSESS THE EFFECT OF BUILDING MATERIAL PRICE FLUCTUATION ON PUBLIC BUILDING CONSTRUCTION PROJECT DELIVERY IN ENUGU STATE, NIGERIA FROM 2015-2024The coupling of project delivery methods and contract strategies for public building projects in Ethiopia

A computer-based cost prediction model for institutional building projects in Nigeria

Purpose – The purpose of this study was develop a computer-based cost prediction m

Distribution Prediction of Strategic Flight Delays via Machine Learning Methods

International audience Predicting flight delays has been a major research topic in th

Material waste minimization techniques in building construction projects

In Ethiopia, the rapid expansion of the construction sector has resulted in the wastage of construct

Machine learning-based model for prediction of accountants behaviour in Nigeria

The integration of technology in accounting roles raises questions about the adaptability and skills

ASSESS THE EFFECT OF BUILDING MATERIAL PRICE FLUCTUATION ON PUBLIC BUILDING CONSTRUCTION PROJECT DELIVERY IN ENUGU STATE, NIGERIA FROM 2015-2024

Significant increase has brought about loss of client confidence in c

The coupling of project delivery methods and contract strategies for public building projects in Ethiopia

Purpose The purpose of this paper is to use Delphi technique to assess the applicability of coupli