Logo Lanfrica
  • Accueil
  • Atlas
  • Analyses
  • Documentation
  • Sign in

© 2026 Lanfrica. Tous droits réservés. Tous les droits d'auteur des ressources affichées sur le site Web Lanfrica appartiennent aux détenteurs de droits d'auteur d'origine, sauf indication contraire explicite.

NEURAL NETWORK AND PROBABILTY BASED COST EXPECTATION LIMIT MODEL FOR RESIDENTIAL BUILDING COST

Type de record:

papermodel
Créateur:
Lek
Éditeur:
Did
Éditeur:
ISE
Hôte:avatar
The aim of this study is to develop a system that could be described as Cost Expectancy Limit Model that could assist clients in having proactive information about construction cost expectation of a particular building type with a view of assisting the client in proactive determination of expected construction cost of a building under predetermined conditions. Two population frames were used in this context, population frame of 1500 samples of actual construction cost of residential building in Lagos state Nigeria out of which 1000 samples of As-built cost (Actual cost) of residential buildings were used, in artificial neural network data training and model development using MATLAB Neuro tools. The second population sample was 250 samples of construction professionals, out of which 200 samples was picked for purpose of questionnaire administration to capture data on factors that could influence building cost expectancy. Mean Item Score, Simple Percentage and Relative Agreement Index of SPSS package was used to analyze and process the data. Cost expectancy limit was developed with parameters trained with Artificial Neural network, while factors that influence the accurateness of the expectancy model were articulated, such as economic factor, political factor, activity of maestros, macro and micro economic variables, and corruption factor among others. The study recommends the use of the model and strategy for effectiveness in accurate prediction of construction cost among other things.

Visit

doi.orgdoi.nrct.go.th

Tags

Parameters, Prediction, Neuro tools, Agreement, Information

Similaires

Artificial Neural Network for Green Building Cost PredictionDEVELOPMENT AND VALIDATION OF A CONSTRUCTION COST INDEX-BASED PARAMETRIC COST ESTIMATING MODEL FOR BUILDING FINISHES IN RESIDENTIAL BUILDING PROJECTS: IMPLICATIONS FOR AFFORDABLE AND SUSTAINABLE HOUSING DEVELOPMENT IN SOUTH-WESTERN NIGERIAA PARAMETRIC COST ESTIMATING MODEL OF WALL FINISHES COST RELATIVE TO TOTAL CONSTRUCTION COST USING CONSTRUCTION COST INDICES OF RESIDENTIAL BUILDING PROJECTS IN SOUTH-WESTERN NIGERIAA Neural Network Model for Construction Projects Site Overhead Cost Estimating in EgyptA computer-based cost prediction model for institutional building projects in NigeriaCost-Effective Optimal Solutions for Steel Catenary Riser Using Artificial Neural Network

Artificial Neural Network for Green Building Cost Prediction

The increased cost of production is one of the challenges to green building development. The purpose

DEVELOPMENT AND VALIDATION OF A CONSTRUCTION COST INDEX-BASED PARAMETRIC COST ESTIMATING MODEL FOR BUILDING FINISHES IN RESIDENTIAL BUILDING PROJECTS: IMPLICATIONS FOR AFFORDABLE AND SUSTAINABLE HOUSING DEVELOPMENT IN SOUTH-WESTERN NIGERIA

The dataset used in this study comprises two complementary data sources collected to develop and val

A PARAMETRIC COST ESTIMATING MODEL OF WALL FINISHES COST RELATIVE TO TOTAL CONSTRUCTION COST USING CONSTRUCTION COST INDICES OF RESIDENTIAL BUILDING PROJECTS IN SOUTH-WESTERN NIGERIA

Data Description Dataset Title Parametric Cost Estimating Model of Wall Finishes Cost Relative to

A Neural Network Model for Construction Projects Site Overhead Cost Estimating in Egypt

Estimating of the overhead costs of building construction projects is an important task in the manag

A computer-based cost prediction model for institutional building projects in Nigeria

Purpose – The purpose of this study was develop a computer-based cost prediction m

Cost-Effective Optimal Solutions for Steel Catenary Riser Using Artificial Neural Network

Abstract Over decades, free-hanging steel catenary riser (SCR) has been regarded as