Logo Lanfrica
  • Accueil
  • Atlas
  • Analyses
  • Documentation
  • Sign in

© 2026 Lanfrica. Tous droits réservés. Tous les droits d'auteur des ressources affichées sur le site Web Lanfrica appartiennent aux détenteurs de droits d'auteur d'origine, sauf indication contraire explicite.

Time-Series Forecasting Model Evaluation for System Reliability in Ethiopian Manufacturing Plants

Type de record:

paper
Créateur:
Bel
Éditeur:
Zenodo
Hôte:avatar

This study evaluates system reliability in manufacturing plants of Ethiopia, focusing on time-series forecasting models to enhance understanding and predictability. A mixed-method approach was employed, integrating both quantitative data from historical plant operation records and qualitative insights from expert interviews to evaluate the time-series forecasting models. The application of ARIMA (Autoregressive Integrated Moving Average) models demonstrated a significant improvement in predicting system failures with an RMSE error rate of less than 5% compared to baseline methods, indicating enhanced reliability measures. The results suggest that time-series forecasting models can be effectively utilised for improving the operational efficiency and reliability of manufacturing systems in Ethiopia, particularly through ARIMA model application. Manufacturing plants should consider adopting time-series forecasting models as a proactive strategy to enhance system performance and minimise downtime. Future research could explore incorporating machine learning techniques into these models. time-series forecasting, system reliability, Ethiopian manufacturing, ARIMA model The maintenance outcome was modelled as $Y_{it}=\beta_0+\beta_1X_{it}+u_i+\varepsilon_{it}$, with robustness checked using heteroskedasticity-consistent errors.

Visit

doi.org

Languages

Amharic

Tags

EthiopiaGeographic Information SystemsTime-Series AnalysisMonte Carlo SimulationPredictive MaintenanceReliability EngineeringQuality Control

Licenses

info:eu-repo/semantics/openAccessCreative Commons Attribution 4.0 Internationalhttps://creativecommons.org/licenses/by/4.0/legalcode

Similaires

Time-Series Forecasting Model Evaluation for System Reliability in Ghanaian Manufacturing PlantsTime-Series Forecasting Model for System Reliability Evaluation in Kenyan Manufacturing PlantsTime-Series Forecasting Model Evaluation for Yield Improvement in Ugandan Manufacturing Plants,Time-Series Forecasting Model Evaluation in Nigerian Manufacturing Plants: A Methodological AssessmentTime-Series Forecasting for System Reliability Evaluation in Ethiopian District Hospitals: A Methodological AssessmentBayesian Hierarchical Model for Measuring System Reliability in Ethiopian Manufacturing Plants Systems

Time-Series Forecasting Model Evaluation for System Reliability in Ghanaian Manufacturing Plants

Manufacturing plants in Ghana face challenges related to system reliability, which can impa

Time-Series Forecasting Model for System Reliability Evaluation in Kenyan Manufacturing Plants

The reliability of manufacturing systems in Kenyan plants is crucial for productivity and c

Time-Series Forecasting Model Evaluation for Yield Improvement in Ugandan Manufacturing Plants,

This study evaluates the application of time-series forecasting models to predict yield imp

Time-Series Forecasting Model Evaluation in Nigerian Manufacturing Plants: A Methodological Assessment

The Nigerian manufacturing sector has experienced significant growth in recent years, but c

Time-Series Forecasting for System Reliability Evaluation in Ethiopian District Hospitals: A Methodological Assessment

Ethiopian district hospitals play a critical role in healthcare delivery across the country

Bayesian Hierarchical Model for Measuring System Reliability in Ethiopian Manufacturing Plants Systems

Manufacturing systems in Ethiopian agriculture often face challenges related to system reli