Logo Lanfrica
  • Accueil
  • Atlas
  • Analyses
  • Documentation
  • Sign in

© 2026 Lanfrica. Tous droits réservés. Tous les droits d'auteur des ressources affichées sur le site Web Lanfrica appartiennent aux détenteurs de droits d'auteur d'origine, sauf indication contraire explicite.

Time-Series Forecasting Model Evaluation in Nigerian Manufacturing Plants: A Methodological Assessment

Domaine:

socioeconomic

Type de record:

paper
Créateur:
NwoAnyIfa
Éditeur:
Zenodo
Hôte:avatar

The Nigerian manufacturing sector has experienced significant growth in recent years, but challenges related to cost management persist. Time-series forecasting models are increasingly being used to predict and manage costs effectively. A case study approach was employed with historical data from three representative manufacturing plants. The Box-Jenkins ARIMA model was used for forecasting, and robust standard errors were applied to quantify prediction uncertainties. The model demonstrated an average forecast error within ±5% of the actual values over a five-year period, indicating high predictive accuracy. The time-series forecasting model evaluated in this study provides a reliable method for assessing cost-effectiveness in Nigerian manufacturing environments. Manufacturers should consider implementing and regularly updating such models to enhance cost management strategies. The maintenance outcome was modelled as $Y_{it}=\beta_0+\beta_1X_{it}+u_i+\varepsilon_{it}$, with robustness checked using heteroskedasticity-consistent errors.

Visit

doi.org

Tags

NigerianTime-seriesForecastingEconometricsRegressionARIMACost-effectiveness

Licenses

info:eu-repo/semantics/openAccessCreative Commons Attribution 4.0 Internationalhttps://creativecommons.org/licenses/by/4.0/legalcode

Similaires

Methodological Evaluation of Manufacturing Plants Systems in Ghana Using Time-Series Forecasting ModelsMethodological Assessment of Manufacturing Systems in Tanzanian Plants Using Time-Series Forecasting ModelsTime-Series Forecasting Model Evaluation for Yield Improvement in Ugandan Manufacturing Plants,Time-Series Forecasting Model Evaluation for System Reliability in Ghanaian Manufacturing PlantsTime-Series Forecasting Model for System Reliability Evaluation in Kenyan Manufacturing PlantsTime-Series Forecasting Model Evaluation for System Reliability in Ethiopian Manufacturing Plants

Methodological Evaluation of Manufacturing Plants Systems in Ghana Using Time-Series Forecasting Models

Manufacturing plants in Ghana face challenges related to system adoption, which can impact

Methodological Assessment of Manufacturing Systems in Tanzanian Plants Using Time-Series Forecasting Models

Manufacturing systems in Tanzanian plants are crucial for agricultural productivity and cos

Time-Series Forecasting Model Evaluation for Yield Improvement in Ugandan Manufacturing Plants,

This study evaluates the application of time-series forecasting models to predict yield imp

Time-Series Forecasting Model Evaluation for System Reliability in Ghanaian Manufacturing Plants

Manufacturing plants in Ghana face challenges related to system reliability, which can impa

Time-Series Forecasting Model for System Reliability Evaluation in Kenyan Manufacturing Plants

The reliability of manufacturing systems in Kenyan plants is crucial for productivity and c

Time-Series Forecasting Model Evaluation for System Reliability in Ethiopian Manufacturing Plants

This study evaluates system reliability in manufacturing plants of Ethiopia, focusing on ti