Logo Lanfrica

Domain adaptation effects on zero-shot cross-lingual retrieval in MIRACL across resource levels

Domain:

natural language processing

Record type:

paper
Creator:
Ass
Publisher:
Zenodo
Host:avatar
Information retrieval across different languages is an increasingly important challenge in natural language processing. Recent approaches based on multilingual pre-trained language models have achieved remarkable success, yet they often optimize for either monolingual, cross-lingual, or multilingual retrieval performance at the expense of others. This paper proposes a novel hybrid batch training strategy to simultaneously improve zero-shot retrieval performance across monolingual, cross-lingual, and multilingual settings while mitigating language bias. The approach fine-tunes multilingual lang Research goal: How does domain adaptation using the hybrid batch training strategy influence the zero-shot cross-lingual retrieval performance on the MIRACL benchmark when evaluated on low-resource languages compared to high-resource languages? Autonomous synthesis report generated by Assignee Research. Tribunal consensus score: 7.5/10. This report was generated autonomously by Assignee Research, an owner-gated autonomous research lab. The content synthesizes findings from peer-reviewed papers. Tribunal score: 7.5/10.

Similar